My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002479
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
2600 - Land Use Program
>
SA-01-43
>
SU0002479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:43 PM
Creation date
9/8/2019 12:54:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002479
PE
2633
FACILITY_NAME
SA-01-43
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
ENTERED_DATE
10/29/2001 12:00:00 AM
SITE_LOCATION
18846 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\18846\SA-01-43\SU0002479\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Alva and Mr. Martin discussed the noise issue. Mr. Alva indicated that he would like a <br /> meeting between Mr. Martin, Ms. Sullivan and himself to discuss the exterior noise issue further. <br /> Mr. Martin indicated that he would inform Ms. Sullivan and get back to Mr. Alva. <br /> Mr. Darrow and Mr. Lagorio discussed the Uniform Building Code. Mr. Darrow informed <br /> Mr. Lagorio that the multi-purpose building is classified as A2.1 occupancy and as such, will <br /> need to be of type V-one hour construction or have fire sprinklers as a substitute for the one- <br /> hour-requirement. <br /> Mr. Martin indicated that on item G. (7) it will be changed to read handicapped parking. <br /> Mr. Dalton asked the applicant where the water would be coming from. Mr. Alva said that they <br /> would be setting a water tank up for static water. Mr. Dalton indicated that the amount of <br /> water that would be needed for the project would be approximately 35 to 50 thousand gallons. <br /> Mr. Dalton said he would need the volume of each individual building. Mr. Dalton informed the <br /> applicants that if they use well water that it would need to be able to pump out water at a <br /> minimum of 1000 gallons a minute. <br /> Mr. Dalton reviewed fire access policies and regulations with the applicants. <br /> Mr. Borges reviewed Environmental Health Division's requirements. <br /> Mr. Karam reviewed the Department of Public Works requirements. <br /> The meeting was adjourned at 11:40 a.m. <br /> DEVELOPMENT COMMITTEE CHANDLER MARTIN <br /> CHAIRMAN <br /> C: Ben Hulse, Director <br /> Kerry Sullivan,Deputy Director <br /> Chandler Martin, Senior Planner <br /> Jennifer Jolley, Associate Planner <br /> Leanne Mueller, Assistant Planner <br /> Gabriel Karam, Public Works Department <br /> Ben Neely, Public Works Department <br /> Dave Lagorio <br /> Paul &Marian McGlothlin <br /> Mario Silva <br /> Lane Weiss <br /> Elizabeth Sanborn <br />
The URL can be used to link to this page
Your browser does not support the video tag.