Laserfiche WebLink
• This project appears to meet this criterion, because the 22.61 acres appears to <br /> be of reasonable size for the intended use. <br /> 4. developed so that buildings occupy no more than 60 percent of the lot and are no more than 3 <br /> stories in height, except in Mountain House community where buildings are no more than 5 <br /> stories in height; and <br /> • Any proposed project processed in the C/FS designation will need to meet this <br /> requirement. <br /> 5. designed in an attractive manner that creates a favorable impression of the County by <br /> considering the overall site design, landscaping, scale of development, signage, relationship to <br /> adjacent uses, circulation and parking, and architecture. <br /> • Any proposed project processed in the C/FS designation will need to meet this <br /> requirement. <br /> Infrastructure Requirements <br /> The General Plan and Development Title contain the following requirements for the provision of <br /> services. When an underlying project is processed it will be subject to the following service <br /> requirements: <br /> General Plan Volume 1 Wastewater Treatment Policy 2 (Pg IV-103) <br /> New development in Freeway Service areas outside of communities shall have at a minimum, access <br /> to a public wastewater system for at least each side of freeway. Septic systems may be permitted if <br /> only one parcel is involved, and if General Plan policies and Development Title Requirements are met. <br /> Development Title Section 9-1105.7 regarding wastewater: <br /> A wastewater disposal system serving only one existing parcel may be privately owned and operated <br /> until additional parcels are served; then it shall become a public wastewater disposal system. <br /> General Plan Volume 1 Water Supply, Policy 2. (Pg. IV-105) <br /> New development in Freeway Service areas outside of communities shall have public water systems <br /> serving at least each side of the freeway. In Freeway Service areas outside of communities, individual <br /> wells may be permitted if only one parcel is involved. <br /> Development Title Section 9-1120.7 regarding water: <br /> A water disposal system serving only one existing parcel may be privately owned and operated until <br /> additional parcels are served; then it shall become a public water system. <br /> General Plan Volume 1 Stormwater Drainage, Policy 1. (Pg. IV-109) <br /> New development in Freeway Service Areas outside of communities, a public drainage system shall <br /> serve at least each side of the freeway. In Freeway Service areas outside of urban communities, <br /> development projects served by a public drainage system planned for an entire freeway service area <br /> or one side of the freeway which discharges into a terminal drain is required except as follows: <br /> A. Agency Retention Basins: The public drainage system may discharge into a retention basin where <br /> all of the following exist: <br /> (1) There are no terminal drainage facilities within 1,000 feet and; <br /> 3 <br />