My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002697
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3724
>
2600 - Land Use Program
>
SA-99-22
>
SU0002697
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:44 PM
Creation date
9/8/2019 12:58:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002697
PE
2633
FACILITY_NAME
SA-99-22
STREET_NUMBER
3724
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
ENTERED_DATE
10/31/2001 12:00:00 AM
SITE_LOCATION
3724 S HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\3724\SA-99-22\SU0002697\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-99-22 <br /> 3. The owner shall execute an Irrevocable Offer and Agreement to Dedicate Road to result <br /> in a thirty-two (32) foot wide right-of-way from the centerline of South 99 Frontage Road <br /> to the property line across the parcel's frontage. (A $225.00 fee currentfy is required for <br /> processing per Development Title Table 9-240.2 in addition to a copy of the Grant Deed.) <br /> (City of Stockton) <br /> 4. The frontage improvements for South 99 Frontage Road shall be constructed in <br /> conformance with the standards for one-half of a 64-foot right-of-way City of Stockton <br /> Industrial Street. The construction of the frontage improvements will be deferred <br /> upon execution by the owner of a Deferred Frontage and Roadway Improvement <br /> Agreement or a Secured Deferred Frontage and Roadway Improvement Agreement <br /> with a deposit equivalent to their estimated construction costs prior to approval of the <br /> Improvement Plan. A $260.00 fee currently is required for processing per Development <br /> Title Table 9-240.2 in addition to a copy of the Grant Deed and an estimate for the <br /> required frontage improvements. The estimate shall be prepared by a Registered Civil <br /> Engineer with a typical section drawing on a form to be supplied by the Department of <br /> Public Works and submitted to the Department of Public Works for approval. As an <br /> option, the Department of Public Works will prepare the drawing and estimate for an <br /> additional fee of$115.00. <br /> (City of Stockton) <br /> 5. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $616.00 per <br /> 1,000 gross square foot of building as Manufacturing in the Stockton area. The fee shall <br /> be automatically adjusted July 1 of each year by the Engineering Construction Cost Index <br /> as published by the Engineering News Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 6. The Water Supply Facilities Impact Mitigation Fee will be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. The fee currently <br /> is $159.00 per 1,000 gross square foot of building as Manufacturing. The fee shall be <br /> automatically increased on January 1 of each year through the year 2005 at the rate of <br /> 7.66 percent. <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 7. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:RH:ti <br /> P8-SD218.111 <br /> E: Manuel Lopez, Deputy Director/Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.