My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012378
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
7735
>
2600 - Land Use Program
>
PA-1900126
>
SU0012378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:07 PM
Creation date
9/8/2019 1:00:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012378
PE
2636
FACILITY_NAME
PA-1900126
STREET_NUMBER
7735
Direction
S
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
STOCKTON
Zip
95206-
APN
17726014
ENTERED_DATE
6/18/2019 12:00:00 AM
SITE_LOCATION
7735 S HWY 99 RD
RECEIVED_DATE
6/10/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\7735\PA-1900126\SU0012378\APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 21, 2015 <br /> Monica Nino <br /> County Administrator <br /> County of San Joaquin <br /> 44 North San Joaquin Street,Suite 640 <br /> Stockton, California 95202-2778 <br /> REQUEST FOR UTILITY SERVICEāAIRPARK 599 PROJECT <br /> This request for utility service directly relates to and is conditioned on the City of Stockton and <br /> County of Sal Joaquin Deferred Annexation Agreement for the Airpark 599 Project dated <br /> V2015. <br /> The project area is depicted on Exhibit "A" (Attachment A) and Conceptual Master Plan <br /> Scheme: 5 dated March 22, 2012 (Attachment B), attached. <br /> General Information and Requirements <br /> County shall prepare utility master plans and improvement plans for water, sanitary sewer, and <br /> storm drain facilities to serve the project in conformance with the latest City of Stockton codes, <br /> policies, guidelines, standards, and specifications. The master plans shall address construction <br /> phasing and interim connections to City facilities. The master plans shall be submitted by <br /> County and approved by the Director of Municipal Utilities prior to preparation and approval of <br /> improvement plans and prior to any connection to City utility facilities. Subsequent to approval <br /> of master plans, improvement plans for water mains, sanitary sewers, and storm drains shall be <br /> submitted by the County and approved by the Director of Municipal Utilities prior to <br /> construction. <br /> The County shall be responsible for all costs involved in the extension of all water mains and <br /> services, sanitary sewer mains and laterals, and storm drain mains and laterals to serve this <br /> project in accordance with City of Stockton Municipal Code and Standards. But under no <br /> circumstances will County be required to pay any City fees or.impositions other than City's <br /> standard water and sewer connection fees based on City's fee schedule in place at time of <br /> connection, which is estimated based on City's current fee schedule at: $1,124,632.11. <br /> (Attachment C) LAFCO review may be required prior to any main line extension. <br />
The URL can be used to link to this page
Your browser does not support the video tag.