Laserfiche WebLink
July 21, 2015 <br /> Monica Nino <br /> County Administrator <br /> County of San Joaquin <br /> 44 North San Joaquin Street,Suite 640 <br /> Stockton, California 95202-2778 <br /> REQUEST FOR UTILITY SERVICE—AIRPARK 599 PROJECT <br /> This request for utility service directly relates to and is conditioned on the City of Stockton and <br /> County of Sal Joaquin Deferred Annexation Agreement for the Airpark 599 Project dated <br /> V2015. <br /> The project area is depicted on Exhibit "A" (Attachment A) and Conceptual Master Plan <br /> Scheme: 5 dated March 22, 2012 (Attachment B), attached. <br /> General Information and Requirements <br /> County shall prepare utility master plans and improvement plans for water, sanitary sewer, and <br /> storm drain facilities to serve the project in conformance with the latest City of Stockton codes, <br /> policies, guidelines, standards, and specifications. The master plans shall address construction <br /> phasing and interim connections to City facilities. The master plans shall be submitted by <br /> County and approved by the Director of Municipal Utilities prior to preparation and approval of <br /> improvement plans and prior to any connection to City utility facilities. Subsequent to approval <br /> of master plans, improvement plans for water mains, sanitary sewers, and storm drains shall be <br /> submitted by the County and approved by the Director of Municipal Utilities prior to <br /> construction. <br /> The County shall be responsible for all costs involved in the extension of all water mains and <br /> services, sanitary sewer mains and laterals, and storm drain mains and laterals to serve this <br /> project in accordance with City of Stockton Municipal Code and Standards. But under no <br /> circumstances will County be required to pay any City fees or.impositions other than City's <br /> standard water and sewer connection fees based on City's fee schedule in place at time of <br /> connection, which is estimated based on City's current fee schedule at: $1,124,632.11. <br /> (Attachment C) LAFCO review may be required prior to any main line extension. <br />