My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012378
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
7735
>
2600 - Land Use Program
>
PA-1900126
>
SU0012378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:07 PM
Creation date
9/8/2019 1:00:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012378
PE
2636
FACILITY_NAME
PA-1900126
STREET_NUMBER
7735
Direction
S
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
STOCKTON
Zip
95206-
APN
17726014
ENTERED_DATE
6/18/2019 12:00:00 AM
SITE_LOCATION
7735 S HWY 99 RD
RECEIVED_DATE
6/10/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\7735\PA-1900126\SU0012378\APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monica Nino <br /> July 21, 2015 <br /> Page 3 of 3 <br /> In the event that project improvements are proposed on parcels overlying the existing 20-inch <br /> sanitary sewer pipeline located on airport property in Easement No. 4 as depicted on the <br /> Airport Property Map Exhibit "A" dated February 1, 2008, the County will be required to assess <br /> the condition of the existing 20-inch sanitary sewer pipeline and consider alternatives for <br /> rehabilitation, replacement, realignment, or abandonment of the pipeline. Public sewers shall <br /> be no less than 8-inch diameter. <br /> REQUEST FOR UTILITY SERVICEāAIRPARK 599 PROJECT <br /> Prior to connection to sewer or water, standard connection fees must be paid to the City of <br /> Stockton and the necessary permit(s) must be obtained from the City of Stockton. <br /> Storm Drainage <br /> Storm drainage to the project site is not currently provided by the City of Stockton. <br /> Retention/Detention storage and/or acquisition of rights-of way and construction of off-site <br /> improvements to terminal drainage facilities may be required. All storm drainage and <br /> Retention/Detention facilities that serve the Airpark 599 Project shall be conveyed to the City <br /> at the time the project is annexed. <br /> Upon payment of all appropriate fees and charges, approval and construction of all master plan <br /> facilities, and completion of any required General Plan Amendment, the City of Stockton can <br /> provide water and sanitary sewer service to the subject property. All necessary permits and <br /> approvals shall be obtained before connection to City utilities will be allowed. It should be <br /> noted that this letter only represe.nts...the status of the City Utility Systems at this time. It does <br /> not constitute a reservation or guarantee of capacity, nor does it vest the property with any <br /> entitlements. This letter will expire 120 months from the date it was written. <br /> KURT 0. WILSON <br /> CITY MANAGER <br /> cc: John Luebberke, City Attorney <br /> David Kwong, Director of Community Development <br /> Gordon MacKay, Director of Public Works <br /> C. Mel Lytle, PhD, Director of Municipal Utilities <br /> J. Mark Myles, County Counsel, San Joaquin County <br /> Mike Selling, Deputy Director, Public Works, San Joaquin County <br />
The URL can be used to link to this page
Your browser does not support the video tag.