Laserfiche WebLink
:Rick Griffin -3- <br /> .COMMUNITY DEVELOPMENT <br /> PA-08-108 (UP) <br /> 11. Dischargers whose projects disturb 1 or more acres of soil or whose projects disturb less than 1 acre but are <br /> part of a larger common plan of development that in total disturbs 1 or more acres, are required to obtain <br /> coverage under the General Permit for Discharges of Storm Water Associated with Construction Activity <br /> (Construction General Permit, 99-08-DWQ) <br /> (http://www.waterboards.ca.gov/water_issues/programs/stormwater/gen_const.shtinl). Construction activity <br /> subject to this permit includes clearing, grading and disturbances to the ground such as stockpiling,or <br /> excavation,but does not include regular maintenance activities performed to restore the original line, grade, <br /> or capacity of the facility. <br /> :12, Construction sites that result in soil disturbance of one acre or greater will require the preparation and <br /> implementation of a Storm Water Pollution Prevention Plan (SWPPP) meeting the requirements of the State <br /> Water Resources Control Board(SWRCB) Order No. 99-08-DWQ,Waste Discharge Requirements (WDRs) <br /> for.Discharges of Stormwater Runoff Associated with Construction Activity(General Permit). <br /> 13. A San Joaquin County Stormwater Discharge Permit is required for this project. <br /> .BD-ss <br /> Rpwsrv(p015Shares\DevSeryiceslDPubServ\COMMErTS\UP\YR 200MPA-0800108.doc <br /> r <br /> 1 <br />