Laserfiche WebLink
�P COUNTY OF SAN JOAQUIN THOMAS R. FLINN <br /> �. <br /> " X ; DEPARTMENT OF PUBLIC WORKS DEPu DIRECTOR <br /> / P. O. BOX 1810- 1810 E. HAZELTON AVENUE <br /> °4(,FoaN P STOCKTON, CALIFORNIA 95201 THOMAS M.GAU <br /> (209)468-3000 DEPUTY DIRECTOR <br /> MANUEL LOPEZ FAX(209)468-2999 <br /> DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> January 30, 2001 <br /> MEMORANDUM <br /> TO: Kerry Sullivan, Deputy Director JAN 3 1 2001 <br /> Community Development Department <br /> CONTACT PERSON: Leanne Mueller Community 0eveicpment Dept, <br /> FROM: GK Gabriel Karam, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-01-01 A SITE APPROVAL APPLICATION FOR AGRICULTURAL TRUCK <br /> PARKING FOR ONE TRUCK AND ONE SET OF DOUBLES, LOCATED ON <br /> THE WEST SIDE OF NEWBY ROAD, 1,400 FEET SOUTH OF STATE <br /> HIGHWAY ROUTE 88. (DISTRICT 2). <br /> APPLICANT: Gary Grimes APN: 101-021-26 <br /> INFORMATION: <br /> The site is located within a Federal Flood Insurance Administration Designated Flood Hazard <br /> Area. The 100 year Flood Elevation will be approximately 35 Feet NGVD. <br /> Newby Road has an existing right-of-way width of 40 feet and a planned right-of-way width of <br /> 50 feet. <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2 The driveway approach shall be improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3, The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $174.59 per <br /> daily trip-end generated in the Stockton area. The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:DM:mr <br /> PS-1A119-MIA <br /> E: Thomas M. Gau, Deputy Director/Development <br />