My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004756
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NEWTON
>
3827
>
2600 - Land Use Program
>
PA-0400768
>
SU0004756
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:12 AM
Creation date
9/8/2019 1:02:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004756
PE
2632
FACILITY_NAME
PA-0400768
STREET_NUMBER
3827
Direction
N
STREET_NAME
NEWTON
STREET_TYPE
RD
City
STOCKTON
APN
13207009
ENTERED_DATE
12/27/2004 12:00:00 AM
SITE_LOCATION
3827 N NEWTON RD
RECEIVED_DATE
12/21/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\NEWTON\3827\PA-0400768\SU0004756\APPL.PDF \MIGRATIONS\N\NEWTON\3827\PA-0400768\SU0004756\CDD OK.PDF \MIGRATIONS\N\NEWTON\3827\PA-0400768\SU0004756\EH COND.PDF \MIGRATIONS\N\NEWTON\3827\PA-0400768\SU0004756\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' � J <br /> Chandler Martin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-04-768 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is $971.00 per 1,000 gross square foot of building <br /> designated as Warehouse/$198.98 per additional daily trip-end generated in the Stockton area. The fee <br /> shall be automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record.) (Resolutions 00-433) <br /> 4. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. (The fee currently is $238.00 per 1,000 gross square <br /> foot of building designated as Warehouse. The fee shall be automatically increased on January I of each <br /> year through the year 2005 at the rate of 7.66 percent.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 7. All new structures or substantial improvements constructed on this parcel shall be elevated a minimum of <br /> one (1) foot above the 100-Year Flood Elevation of twenty-seven(27) feet. <br /> Note: Any construction activity that results in the disturbance of at least one (1)acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:SH:ar <br /> P.�OAASENTSI A\V 200 A-09 768.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.