Laserfiche WebLink
Furthermore, the submitted marketing plan, under I. G. d. & e. (expected number of full-time and part-time <br /> employees), indicates "zero." The number of employees who will work at the winery, for both the tasting <br /> room and approved marketing events, must be stated in the new marketing plan. <br /> Access <br /> The submitted site plan shows a two-way driveway aisle width of twenty (20) feet. Development Title <br /> Section 9-1015.5(h)(1) states, "Access driveways shall have a width of no less than twenty-five (25) feet <br /> for two-way aisles and sixteen (16) feet for one-way aisles except that in no case shall driveways <br /> designated as fire department access be less than twenty (20) feet wide." Driveway and aisle widths, that <br /> meet Development Title requirements, must be shown on the Improvement Plan as well as the circulation <br /> patterns for ingress and egress traffic. <br /> Parking <br /> The submitted site plan indicates fifty (50) parking spaces, 2 of which are handicapped accessible. <br /> Development Title Table 9-1015.3(a) requires that 2.5 parking spaces must be provided for each 1,000 <br /> square feet of building area. The required number of parking spaces is 3, 1 of which must be <br /> handicapped accessible. Therefore, the proposed project meets the required number of parking spaces. <br /> The guidelines for parking stall dimensions for automobiles are a minimum of twenty (20) feet long by <br /> nine (9) feet wide (Development Title Section 9-1015.5). The dimensions for automobile stalls for the <br /> required parking spaces must be shown on the Improvement Plan. <br /> The parking surfacing requirement for off-site wine cellars, for both required parking spaces and <br /> marketing event parking spaces, must be chip seal or an alternative surfacing material (Development <br /> Title Section 9-1075.8[i]). <br /> Building Division <br /> The change of use from a detached accessory building to wine tasting and wine storage requires a <br /> commercial building permit; this will require an occupancy change from an existing occupancy of Group <br /> U, to the proposed occupancy of Group M, Group B, and Group S, division 1. <br /> San Joaquin County Council of Governments <br /> San Joaquin County is a signatory to the San Joaquin County Multi-Species Habitat Conservation and <br /> Open Space Plan (SJMSCP). Participation in the plan satisfies requirements of both the state and federal <br /> endangered species acts, and ensures that the impacts are mitigated below a level of significance in <br /> compliance with the California Environmental Quality Act. Although participation in the SJMSCP is <br /> voluntary, if the applicant chooses not to participate, the applicant will be required to provide alternative <br /> mitigation in an amount and kind equal to that provided in the SJMSCP. <br /> This project is subject to the SJMSCP. Please contact the Council of Governments staff regarding the <br /> scheduling of a SJMSCP biologist to perform a pre-construction survey and any other mitigation <br /> measures. The pre-construction survey must be completed prior to any ground disturbance. <br /> The Community Development Department has reviewed the Site Approval application and responses <br /> from other agencies. The Community Development Department intends to approve Site Approval No. <br /> PA-0800268 subject to the following conditions: <br /> 2 <br />