Laserfiche WebLink
Aa�t" APPLICATION — AGRICULTURAL EXCAVATION <br /> o.• c <br /> r�:�iY•.o <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: PA- <br /> RIP <br /> A- <br /> x . <br /> D. Size: Provide the following information: <br /> [X] 1. Total acreage permitted or to be permitted. <br /> [X1 2. Total acreage to be disturbed. <br /> [X] 3. Total acreage to be reclaimed. <br /> E. Water Requirements: <br /> [X1 1. Estimate of daily and annual water requirements. <br /> [X] 2. Identify the sources and uses of water. <br /> F. Contaminants: <br /> [X] 1. Identify potential contaminants and describe how they will be controlled or disposed. <br /> [ 1 2. Describe how imported wastes such as domestic garbage, chemicals,oil,or other materials will be disposed of. <br /> G. Waste Water: Discuss: <br /> [X] 1. How waste water will be contained or disposed of. <br /> H. Ore Processing: <br /> [X] 1. Describe the proposed method and equipment for processing ore(e.g.,dry screening,flotation,leaching,etc.). <br /> [X1 2. Estimate minimum and maximum capacity(input and output)of the mill/processing facility. <br /> [X1 3. Provide the estimated life of the processing operation (if different from mine life). <br /> [ ] I. Other Information: Include any other information requested by the lead agency to assess the environmental impacts of <br /> the proposed operation. <br /> III. DESCRIPTION OF PROPOSED RECLAMATION <br /> A. Subsequent Use(s): <br /> [X] 1. What is the proposed subsequent use for the reclaimed mined land(e.g., recreation,wildlife habitat,grazing,open <br /> space, etc.)? <br /> [X] 2. Evidence that owner(s)of a possessory interest(including surface rights)have been notified of the proposed use or <br /> potential uses after reclamation. <br /> B. Reclamation Schedule: <br /> 1X1 1. Provide a time schedule that will ensure reclamation at the earliest possible time on those portions of the mined <br /> lands that will not be subject to further disturbance. <br /> 1X1 2. Provide a map of the proposed phases of reclamation and the corresponding acreage and dates for completion of <br /> each phase. <br /> [X] 3. If reclamation will not be concurrent with mining,explain why. <br /> F:\DEVSVC"anning Application Forms\ Pagel 0 of 13 <br /> Agrecultural Excavation.doc.(Revised 8-10-05) <br />