Laserfiche WebLink
Pqu <br /> _�°mac APPLICATION - AGRICULTURAL EXCAVATION <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: PA- <br /> MIN! <br /> A- <br /> ?'b N- <br /> . .cK< •.-w� f .�$:.; ._.� ...."k .FiFi �I �•h Y syr.!Hg344 -t"ti <br /> B. Reclamation Schedule: <br /> [XJ 1. Provide a time schedule that will ensure reclamation at the earliest possible time on those portions of the mined <br /> lands that will not be subject to further disturbance. <br /> [XJ 2. Provide a map of the proposed phases of reclamation and the corresponding acreage and dates for completion of <br /> each phase. <br /> [XJ 3. If reclamation will not be concurrent with mining, explain why. <br /> C. Post Mining Topography: <br /> [X) 1. Provide a map of proposed post-reclamation topography; show drainage plan, benches, roads, plantings,and other <br /> pertinent features of the reclamation. <br /> [XJ 2. Attach cross sections through slopes,cuts,and fills;show original ground,post-mining surface, underlying geologic <br /> conditions,and reclaimed surface. <br /> [XJ 3. Describe how slopes will be stabilized to prevent failures/landslides,earth flows,falling rock, and erosion. <br /> [ J 4. Specify slope design calculations including the factor of safety. <br /> [ ] D. Impoundments: Describe how impoundments will be reclaimed (e.g., regraded,dewatered,capped, revegetated, <br /> removed,etc_). <br /> [XJ E. Drainage: Describe provisions for natural drainage and how erosion of disturbed land and sedimentation will be <br /> controlled during excavation and after final reclamation (e.g.,revegetation, rip rap,sedimentation basins, berms,ditches, <br /> water bars,silt screens regrading, etc.). <br /> [XJ F. Disposition of Old Equipment: Discuss the disposition of equipment, buildings,structures,etc. <br /> G. Revegetation: <br /> [XJ 1. Explain topsoil(or soil substitute)redistribution methods, including volumes of materials to be redistributed, <br /> equipment and methods for transport, methods for preventing over compaction, and schedule for replacement. The <br /> explanation may include: <br /> [ ] a. The average thickness of replaced topsoil on the mine site. <br /> [ ] b. Tests that will be run to determine whether soil or mine wastes need soil amendments to promote the support <br /> plant growth. <br /> [ J c. Methods to be used to protect redistributed topsoil (or soil substitute)from wind and water erosion before and <br /> after seeding and planting. <br /> [ ) 2. Explain the types and amounts of fertilizers, mulch, soil stabilizers, lime, or other materials that will be used in <br /> revegetation and indicate when they will be applied. <br /> [ ] 3. Provide a planting plan. The plan may include: <br /> [ ) a. How the site will be prepared for planting (e.g., ripping,disking, and incorporation of soil additives). <br /> [ ] b. A list of the species(include scientific names)to be planted. <br /> [ ) c. The type of plant material to be used (e.g., seeds,cuttings,container, plugs). <br /> F.\DEVSVC\Planning Application Forms\ Page 11 of 13 <br /> Agrecultural Excavation.doc (Revised 8-10-05) <br />