Laserfiche WebLink
-2- <br /> Community Development Department <br /> PA-1800232(IP) <br /> www.casga.ore.Plans and/or calculations shall be submitted to the County for review and <br /> approval. <br /> b. Applicant shall-submit a"Storm Water Pollution Prevention Plan"(SWPPP)to Public Works <br /> for review. A SWPPP preparation guide is available aithe Department of Public Works. A <br /> copy of the approved S WPPP and all required records,updates,test results and inspection reports <br /> shall be maintained on the construction site and be available for review upon request.The post <br /> construction chapter of the S WPPP must identify expected pollutants and how they will be <br /> prevented from entering the storm system. The chapter shall also contain a maintenance plan, <br /> a spill plan,and a training plan for all employees on proposer use,handling and disposal of <br /> potential pollutants.The example plans are available in the SWQCCP and CASQA <br /> handbooks. <br /> c. Permit Registration Documents(PRD's)shall be filed with the State Water Resources <br /> Control Board(SWRCB)to comply with the State"General Permit for Storm Water <br /> Discharges Associated with Construction Activity". The Waste Discharge Identification <br /> (WDID)Number issued by SWRCB shall be submitted to the Department of Public Works <br /> for the file. Contact SWRCB at(916)341-5537 for further information. Coverage under the <br /> S-WRCB General Construction Permit Order 2009-0009-DWQ shall be maintained <br /> throughout-the duration of all phases of the project. <br /> d. All priority New Development and Significant Redevelopment Projects must meet the <br /> volume reduction requirement outline in the County's SWQCCP 2009 available at <br /> http://sicleanwater.org/LID.htm. <br /> e. Proprietary storm drainage treatment devices used in any system shall be approved for use <br /> by a major California city, Caltrans, or the Washington State DOT and shall be the last <br /> resort of the developer to comply with the 2009 SWQCCP.Latitude and Longitude of all <br /> treatment devices shall be obtained by use of a global positioning system and reported to the <br /> County.Property owner shall execute an agreement and record a deed restriction, in a form <br /> acceptable to the County, regarding maintenance and perpetuation of the installed systems. <br /> Property owner shall be responsible for the ongoing operation and maintenance of any <br /> system installed unless the system is accepted for maintenance by a government agency. <br /> f. Owner shall be responsible for providing the County with an annual report of operation and <br /> maintenance of any system.The property owner shall also be responsible for the payment <br /> to the County of an annual system inspection fee established by Resolution of the Board of <br /> Supervisors. <br /> g. A Maintenance Plan shall be submitted and the execution of a Maintenance Agreement <br /> with San Joaquin County shall be required for the owner/operator of stormwater controls <br /> prior to the release of the building permit. <br /> h. Standard Best Management Practices for the type of development proposed shall be <br /> incorporated into the site design. <br />