Laserfiche WebLink
-2 - <br />Community Development Department <br />PA -1800232 (TP) <br />Y W 11,casga.01 Plans all 01 calculations shall be submitted to the County for review and <br />approval. <br />b. Applicant shall submit a "Storm Water Pollution Prevention Plan" (SWPPP) to Public Warks <br />forreview. A SWPPP-preparationguide is available at the Department of Public Works. A <br />copy of the approved S WPPP and all required records, updates, test results and inspection reports <br />It <br />shall be maiaxtained on the construction site and be available for review upon request. The post <br />constnnction chapter of the SWPPP must identify expected pollutants and how they will be <br />prevented from entering the storm. system. The chapter shall also contain a maintenance plan, <br />a spill pian, and a training plan for all employees on proposer use, handling and disposal of <br />potential pollutants. The example plans are available in the SWQCCP and CASQA <br />handbooks. <br />c. Permit Registration Documents (PRO's) shall be filed with the State Water Resources <br />Control Board (SWRCB) to comply with the State "General Permit for Storm Water <br />Discharges Associated with Construction Activity". The Waste Discharge Identification <br />(WDID) Number issued by SWRCB shall be submitted to the Department of Public Works <br />for the file. Contact SWRCB at (916) 341. 5537 for further information. Coverage under the <br />SWRCB General Construction Permit Order 2009-0009=DWQ shall be maintained <br />throughout the duration of all phases of the project. <br />d. All priority New Development and Significant Redevelopment Projects must meet the <br />volume reduction requirement outline in the County's SWQCCP 2009 available at <br />littI)I/sicleallwetel * .014g/LID.htm. <br />e. Proprietary storm drainage treatment devices used irn any system shall be approved for ruse <br />by a major Cali%na.ia city, Caltrans, or the Washington State DOT aznd shall be the last <br />resort of the developer to comply with the 2009 SWQCCP. Latitude and Lon. ade of all <br />treatment devices shall be obtained by use of a global positioning system and reported to the <br />County, Property owner shall execute an agreement and record a deed restriction, in a form <br />acceptable to the County, regarding maintenance and perpetuation of the installed systems. <br />Property owner shall be responsible for the ongoing operation and maintenance of any <br />system installed unless the system is accepted for maintenance by a government agency. <br />f. Owner shall be responsible for providing the County with an annual report of operation an <br />d <br />maintenance of azny system, The property ownLr shall also beresponsible-for the payment <br />to the County of an annual system inspection fee established by Resolution of the Board of <br />Supervisors. <br />g. A Maintenance Plan shall be submitted and <br />the execution of a Maintenance Agreement <br />with Sari Joaquin County shall be required for the owner/operator of stonnwater controls <br />prior to the release of the building penmit. <br />h. Standard Best Management Practices for the type of development proposed shall be <br />incorporated into the site design. <br />