Laserfiche WebLink
O�,gU1N C �. • %rif THOMAS R. FLINNP.O. BOX 1810-1810 E. HAZELTON AVENUE <br /> w: < <br /> DIRECTOR `aq*Y, STOCKTON,CALIFORNIA 95201-3018 <br /> �l (209)wwwc 00 FAX( in.c 468-2999 <br /> (,F j5-ii,�P <br /> www.co.san-joaquin.ca.us <br /> THOMAS M. GAU <br /> DEPUTY DIRECTORS <br /> MANUEL SOLORIO Working for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGERJANES RF A <br /> BUSINESS ADMINISTRATOR <br /> cQ DF <br /> c 1 <br /> December 15, 2005 rnrn 6 zoos <br /> y Dere%pmen <br /> t Dept. <br /> MEMORANDUM <br /> TO: Chandler Martin, Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Karla Kuhl <br /> FROM: Michael R. Callahan, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: PA-05-470 A USE PERMIT APPLICATION TO CONVERT AN EXISTING 2,400 SQUARE <br /> FOOT AGRICULTURAL BUILDING INTO A LARGE AGRICULTURAL STORE, LOCATED <br /> ON THE NORTHWEST CORNER OF REEVE ROAD AND BYRON ROAD. <br /> (SUPERVISORIAL DISTRICT 5) <br /> PROPERTY OWNER: Samad A. Aziz <br /> ADDRESS: 21301 S. Reeve Road APN: 209-180-02 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Reeve Road has an existing right-of-way width of 40 feet and a planned right-of-way width of 50 feet. <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of San Joaquin County <br /> Standards R-17 prior to issuance of the occupancy permit. (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is $1509 per 1000 gross square foot of building <br /> designated as Service Commercial in the Tracy area. The fee shall be automatically adjusted July I of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolutions R-00433) <br />