Laserfiche WebLink
uIN C; i <br /> z P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> KRIS BALAJI <br /> DIRECTOR wh STOCKTON,CALIFORNIA 95201 <br /> (� (209)468-3000 FAX(209)468-2999 <br /> `g wwwsigov.orglpubworks <br /> Col/FORd`P• �' <br /> �A <br /> MICHAEL SELLING <br /> DEPUTY DIRECTOR vv="`- 1 <br /> "'d ;e ��ou <br /> 33 <br /> FRITZ BUCHMAN RECEIVED <br /> DEPUTY DIRECTOR <br /> JIM STONE JAN —s 2m <br /> DEPUTY DIRECTOR ' <br /> ROGERJANES <br /> BUSINESS ADMINISTRATOR San JOabUin County <br /> Community Development <br /> January 7,2016 <br /> MEMORANDUM <br /> TO: John L. Funderburg, Principal Planner <br /> Community Development Department <br /> CONTACT PERSON: Rick Griffin <br /> FROM: Alex Chetley,Engineering Services Manager <br /> Development Services Division <br /> SUBJECT: PA-1500250; A Minor Subdivision application to subdivide an existing 15.2-acre parcel into four <br /> parcels and a designated remainder. Parcels One, Three, and Four to contain 2.0 acres each, <br /> Parcel Two to contain 2.5 acres, and the designated remainder to contain 6.2 acres; located on the <br /> west side of Reid Avenue, approximately 665 feet south of Copperopolis Road,Linden. <br /> (Supervisorial District 4) <br /> PROPERTY OWNER: Joseph M. and Linda M. Martinez APPLICANT: Monte K. Seibel <br /> ADDRESS: 303 S. Reid Avenue,Linden APN: 183-360-08 <br /> INFORMATION: <br /> The site is not currently located within a Federal Emergency Management Agency Designated Flood Hazard Area. <br /> However,the site is in an area that has been subject to historic flooding. <br /> Reid Avenue has an existing right-of-way width of 45 feet and a planned right-of-way width of 50 feet. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Regional Transportation Impact Fee will be required when parcels are developed. The fee is due and payable <br /> at the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee shall be required when parcels are developed. The fee is due <br /> and payable at the time of building permit application. <br />