Laserfiche WebLink
Mr. Timothy O'Brien <br /> CR WQCB <br /> 5. The schedule for excavating the remaining 11-acres on-site is proposed to take place over <br /> a four-year period. Three acres will be mined and reclaimed during each of the first three <br /> years, with the remaining two acres being mined and reclaimed during the fourth year. <br /> The facility has a valid Use Permit through 2029 with San Joaquin County to process <br /> materials from ancillary sources. These sources are identified and permitted on an as- <br /> needed basis. Currently, material is imported from a nearby site across the street from the <br /> processing plant, and a second site has been permitted approximately two (2) miles away. <br /> Supplemental materials are also imported for from other company facilities. <br /> Capacity in the wastewater ponds as they fill with fine-grained sand is maintained by <br /> frequent visual monitoring. The pond(s) area is situated in a previously mined section of <br /> the property. Additional ponds are constructed adjacent to the existing pond, as needed, <br /> in a northerly direction. No future excavation of the ponds is planned. Former ponds are <br /> reclaimed back to orchards by covering the fine-grained sediment with topsoil, and <br /> planting the area up with trees. <br /> 6. An aerial photo is enclosed depicting the areas where excavation has occurred on the site <br /> in the past. All on-site aggregate reserves have been depleted. [Attachment E] <br /> 7. Well Details- <br /> The prior RWD recapped some details on the three wells that supply water for the <br /> processing plant systems. The recap table included a category titled "Approximate Age", <br /> and stated that two of the wells were 1 year and 6 years old (respectively). Further inquiry <br /> with facility personnel reveals that the ages presented actually reflected the most recent <br /> time the well pumps were replaced. The wells themselves are older. Efforts to obtain well <br /> log / construction details through the DWR and local drillers thus far have not been <br /> successful. <br /> We have identified and contacted a company that performs video logging services. Since <br /> there are three wells located on the property, the most prudent approach towards <br /> consolidating this task is to coordinate the taping with a window of time when none of the <br /> processing plants are operating. The facility is scheduled to be down for periodic <br /> maintenance during the first week of March, 2008. We are arranging to have the three <br /> wells video logged during that time. Results will be provided to the CRWQCB soon after. <br /> 8. All on-site wells have been sampled for arsenic, as per the instructions in your letter. The <br /> following table recaps the results for the three production wells, along with the prior test <br /> result of the wash recycle ponds: <br /> Source Arsenic u /L <br /> Well # 1 2.1 <br /> Well # 2 2.0 <br /> Well # 3 2.1 <br /> Wash Recycle Ponds (prior) 3.6 <br /> A copy of the complete test results is enclosed. [Attachment F] <br /> 2 <br />