My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007300
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
26292
>
2600 - Land Use Program
>
QX-89-0002
>
SU0007300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 3:08:38 PM
Creation date
9/9/2019 9:06:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007300
PE
2656
FACILITY_NAME
QX-89-0002
STREET_NUMBER
26292
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
APN
24722019
ENTERED_DATE
7/29/2008 12:00:00 AM
SITE_LOCATION
26292 E RIVER RD
RECEIVED_DATE
7/28/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\26292\QX-890002\SU0007300\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
629
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.4 Noise <br /> r� <br /> 'alM <br /> As shown in Table 3.4-3, average noise exposure at measurement site 4, which is assumed to <br /> adequately represent the closest residences to the north of the project site,is approximately 59 dB <br /> �i Leq with an hourly noise exposure range of 51-63 dB Leq during the 9 p.m.to 5 a.m. hours of the <br /> measurement survey. Likewise, average measured ambient noise exposure at measurement site <br /> 1' A to the east was approximately 43 dB Leq with a range of 35-48 dB Lea• The anticipated project <br /> asphalt plant noise exposure at the closest residences to the north (43 dB Leq)would, on average, <br /> be more than 10 dB below the existing ambient noise exposure, and would not be expected to <br /> contribute significantly to the existing noise environment at this receiver or other receivers along <br /> I tJ_ East River Road to the north of the project. At site A,project asphalt plant noise exposure(40 dB <br /> Leq)would, on average, increase the noise environment by approximately 2 dB (from 43 dB Leq to <br /> 45 dB Leq). Given a significant increase threshold of+5 dB based on the relatively low existing <br /> ambient noise exposure,the anticipated increase in noise exposure from asphalt plant operations <br /> during the 9 p.m.to 5 a.m.hours would not be considered significant. <br /> Project-Related Noise Exposure from Haul Trucks <br /> A detailed assessment of expected project-related haul truck noise exposure at the closest residences <br /> t : <br /> along East River Road is provided within the Bollard Acoustical Consultants,Inc. report of August <br /> 18, 2010. The following utilizes reference noise level measurements and assumed truck <br /> operations from that report. <br /> Regulatory Standards and Ambient Noise Level Increases <br /> Standard Heavy Truck Operations(1Vo Optimization of Operating Parameters) <br /> # Noise exposure at the closest residential properties along East River Road from proposed project <br /> haul truck trips was calculated using the measured average truck passby noise exposure(average <br /> SEL)and operational data presented in the BAC report of August 18,2010.Haul truck noise exposure <br /> at the closest residences to East River Road were calculated from the following equation. <br /> FI Ldn = SEL,vg +I Uog(Neq)--T <br /> t <br /> In this case, SEL,,v,is the average measured SEL,or 86 dB at 40 feet(approximately 83 dB at 60 <br /> feet);Neq is the equivalent number of haul truck operations calculated by adding the number of <br /> Fit <br /> daytime trips(between 9 p.m. and 10 p.m.) and 10 times the number of nighttime trips(between <br /> 10 p.m.=5 a.m.), or approximately 1,886(248 total truck trips); and T is approximately 49.4 or <br /> I OLog(seconds in a 24-hour day). <br /> Using the reference noise level data, operations,and the equation above,project-related haul <br /> k trucks would be expected to produce noise exposure of approximately 66 dB La„at the closest <br />'r I residences to the project on East River Road(60 feet from centerline). This noise exposure <br /> IM.+ exceeds the applicable noise exposure limit of 65 dB Ldn established by the County. <br /> Optimized Heavy Truck Operations Parameters <br /> The project developer has proposed to operate all project trucks using noise-mitigating Operating <br /> g <br /> parameters when entering or leaving the plant on East River Road. Based on testing conducted by <br /> Bollard Acoustical Consultant, Inc.,the quietest haul truck operating parameters were as follows. <br /> Munn&Perkins Quarry Excavation Permit 3.4-13 ESA 7211086 <br /> Draft ER April 2011 <br /> A 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.