My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007300
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
26292
>
2600 - Land Use Program
>
QX-89-0002
>
SU0007300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 3:08:38 PM
Creation date
9/9/2019 9:06:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007300
PE
2656
FACILITY_NAME
QX-89-0002
STREET_NUMBER
26292
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
APN
24722019
ENTERED_DATE
7/29/2008 12:00:00 AM
SITE_LOCATION
26292 E RIVER RD
RECEIVED_DATE
7/28/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\26292\QX-890002\SU0007300\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
629
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Munn S Perkins Quarry Excavation Permit <br /> 0 <br /> • Empty Trucks: Travel speed at 38-43 mph with engines in 8t1'gear at 700-800 rpm. <br /> • Loaded Trucks: Travel speed of 33-35 mph with engines in 6d'or 7d'gear at 1,400-1,600 rpm. <br /> Average resulting noise exposure from truck passbys using these "optimized"parameters was <br /> approximately 4 dB less than average noise exposure from passing trucks using unknown operating <br /> parameters.Therefore,it is expected that haul truck noise exposure may be reduced by approximately <br /> 4 dB given that all project trucks utilize the operating parameters described above.Resulting noise <br /> exposure at the closest residences to the project on East River Road(60 feet from centerline)would <br /> be approximately 62 dB Ldr,. This noise exposure is below the County's noise exposure limit of <br /> 65 dB Ld,,. . <br /> It is assumed that standard residential building construction in good condition will provide no less <br /> than 25 dB of exterior-to-interior noise level reduction when exterior doors and windows are closed. <br /> Therefore, exterior noise exposure would need to exceed 70 dB Lan for interior noise exposure to <br /> possibly exceed the County 45 dB Lan limit(i.e., 70 dB—25 dB =45 dB).Project-related traffic <br /> noise exposure due to haul trucks is not expected to exceed 66 dB Ldr,at the closest residences on <br /> East River Road. Therefore, project-related traffic noise exposure is not expected to exceed the <br /> applicable 45 dB Lan noise exposure criterion for the interior of these residences. <br /> Noise Exposure Increase <br /> Measured ambient noise exposure at the closest residences to the project site on East River Road <br /> was in the range of 67-69 dB Ldn(Site 4). The addition of project-related haul truck noise exposure <br /> at a level of 62 dB Ld„(with proposed optimized operating parameters)would be expected to increase <br /> the traffic-related noise exposure at this residence and others near this setback distance to approximately <br /> 68-70 dB Ldn.This increase of approximately I dB would not be considered significant based on <br /> the FICON guidelines presented above. <br /> The addition of project-related haul truck noise exposure at a level of 66 dB L&(without proposed <br /> optimized operating parameters)would be expected to increase the traffic-related noise exposure <br /> at the closest residences on East River Road by approximately 2-3 dB,or 70-71 dB L&. This <br /> noise exposure increase would be significant based on the FICON guidelines presented above. <br /> Sleep Disturbance/Probability of Awakening <br /> The ANSI/ASA 512.9-2008 Part 6 was used to estimate the probability of awakenings of existing <br /> residents in the project area with current conditions and for future conditions due to project- <br /> related haul truck operations. <br /> Current Conditions <br /> A total traffic volume of 182 project haul trucks was assumed to traverse a given section of East <br /> River Road in the project area during a typical 7-hour sleeping period(assumed to be'10 p.m.-5 <br /> a.m.).A given truck passby was assumed to produce an average event noise exposure level of 58 <br /> dB SEL within a residence 60 feet from the centerline of the roadway(83 dB exterior SEL).The <br /> probability of the residents located 60 feet from East River Road awakening at least once during <br /> the night from project haul truck noise was calculated to be approximately 93 percent.This probability <br /> Munn&Perkins Quarry Excavation Permit 3.4-14 ESA!211086 <br /> Draft EER April 201t <br />
The URL can be used to link to this page
Your browser does not support the video tag.