My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007300
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
26292
>
2600 - Land Use Program
>
QX-89-0002
>
SU0007300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 3:08:38 PM
Creation date
9/9/2019 9:06:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007300
PE
2656
FACILITY_NAME
QX-89-0002
STREET_NUMBER
26292
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
APN
24722019
ENTERED_DATE
7/29/2008 12:00:00 AM
SITE_LOCATION
26292 E RIVER RD
RECEIVED_DATE
7/28/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\26292\QX-890002\SU0007300\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
629
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Response to Comments <br /> Bollard Acoustical Consultants.. Inc. (BAC) has completed SOLMOLAN modeling,of the project <br /> asphalt plant. Project asphalt plant noise contours are a result of this modeling effort. These <br /> contours are presented in BAC's report of September 1. 2011. The noise contours support BAC's <br /> noise level measunmellts/arlalysis that project asphalt plant noise exposure does not exceed the <br /> applicable 5 dB L ,l criterion at the closest residential receivers. The September 1, 201 l BAC <br /> report has been included as Appendix A of the Filial EIR. <br /> Response to Comment 1-27: <br /> The cclnunentel-questions the feasibility of the proposed "optimization of Ileavy trLlck operating <br /> pararimer-, to r111111i11rze passbY noise. <br /> It has been shown throw-h controlled measurements conducted by Bollard Acoustical Consultants. <br /> Inc. (BAC)that an avera0e noise level reduction of 4 dB (SEI_ per truck passby) call be provided <br /> by iniplellicat111g the proposed operating parameters. I hese parameters iticlude speeds of`38-43 <br /> mph at 700-800 rpm in 8`l` sear %lien arriving to the site empty, and speeds bclov, ')3-=5 mph at <br /> 1600-1800 rpn1 in 61' or 7"' gear. We agree with Both BAC and J.C. Brennan & Associates that <br /> these IlleaSUI-CS %Ould be difficult to enforcc, budge also agree Nvlth BAC that cvery noise level <br /> l'ednCt1011 MeaSllre had al *,first tlille." alld 1Llst becallse it i111`?Ilt 11C ClrffiClllt to ellforCe/t"COLllalte and <br /> maintain_ does not make it unreasonable or infeasible. At one point, noise-mitigating aircraft <br /> departure procedures at major U.S. airports (e.g., John Wayne Airport, Orange County) %'ere <br /> Clnestloned for the saline reasons. belt now benefit the CO111111L1111tieS around them. With appropriate <br /> t:dueatlon and enforceIllcnt, the: provided mitigation measure would be expected to benefit the <br /> residents on East River Road near the project site. <br /> Response to Comment 1-28: <br /> The commenter addresses the Methodology used ire the "probability of awakening" analysis <br /> %pilin the Bollard Acoustical ConSultants. [tic. (BAC) report of August 23, 2010. Atter aceept.in) <br /> that the project DEIR has utilized the ANSIIASA S 12.9-2008/Part 6 methodology for assessing <br /> probability of arvakenin�,z from p1-ojOct truck passbys.. the comincnter questions the reference noise <br /> level assumed for automobile passbys oil East River Road (i.e., at 60 feet. 75 dB SEI.. for autos <br /> compared to 83 dB SEL for heavy trucks) and the comparison of noise exposure front passing <br /> Milos relative to passing heavy trucks due to the different frequency content of the sources. <br /> First_ the pro?jeet DLI 1Z noise section does clot implement the FWAN sleep disturbance criteria <br /> implemented by BAC in their report of August 23. 2010. Instead, the DEIR has implemented the <br /> ANSI/ASA 512.9 methodolo4py to assess the probability of awakening duc to project truck <br /> passbys on East River Road. Its this case, art increase in the probability of 5% relative to the "no <br /> project" condition %as deemed significant. The reference noise exposure level ol'75 dB SEL I'm- <br /> automobile passbys was 1llcasured by BAC in 2008 during, their ambient noise measurement <br /> surveys in the project area. In their rllerllo of October 22, 2010, BAC refers to this noise level as a <br /> -conservative"estimate of single-event traffic (auto) noise exposure. For passenger cars/trucks <br /> tlavelin�T 55 mph an t1 rural raaclwtl}, this single-event noise exposure level is reasonable. <br /> Additionally_ this level is 8 dB lover than the level measltred/assurlicd for heavy truck passbys at <br /> -__-- Munn&Perkins Quarry Excavatio:r Permit 3-15 ESA 1 2110E3C, <br /> Final Envircnmental lMpad Report September 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.