Laserfiche WebLink
f. A cash deposit or security in the amount and form acceptable to the Department of Public Works <br /> shall be filed with the Department with a guarantee that if the permittee fails, refuses, or neglects <br /> to epair, under permit, any damages to any County roads along the haul route which may result <br /> from the permittee's operation, Public Works may do the work necessary to restore County roads <br /> along the haul route to equal or better than original condition, using the funds from said cash <br /> deposit or security. (Development Title Section 9-854.3) <br /> 9. A maintenance agreement to ensure that all roads designated as haul routes are maintained to a <br /> condition acceptable to San Joaquin County shall be executed by the applicant- In lieu of the <br /> maintenance agreement, a one-time road maintenance fee may be acceptable to the County. <br /> Application for the in-lieu fee may be made to the Department of Public Works. <br /> h. The Traffic Impact Mitigation Fee may be required for this development The fee is due and <br /> payable at the time of building permit application. The fee currently is$164.86 per trip-end in the <br /> Escalon area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. The number of trip-ends <br /> may be determined by a proportion to the length in time of the excavation operation. (Resolution <br /> R-96-592) <br /> 3 ENVIRONMENTAL HEALTH DEPARTMENT (Staff Contact: Lary Godinho, 468-0330) <br /> a. No excavations are permitted into the ground water table without specific approval from the <br /> Regional Water Quality Control Board, Central Valley Region (California Water Code, Chapter 4, <br /> Article 3, Section 13240). <br /> b. The materials from an excavation shall not be deposited into any watercourse or in any way <br /> contribute to the pollution thereof(California Water Code, Section 13376). <br /> c. An approved potable water supply must be provided for all employees(Development Title Section <br /> 9-1100.1). <br /> d- Approved sanitary fadities must be provided for all employees(Development Title Section 9- <br /> 1100.1). <br /> 4 SOUTH SAN JOAQUIN IRRIGATION DISTRICT (Staff Contact Sam Bologna, 823-3101, ext- 111) <br /> a. The owner shall be required to replace the existing pipeline and relocate it to a location along the <br /> outer perimeter of the excavation. <br /> b The owner shall be required to submit plans to the district for review and approval by the South <br /> San Joaquin Irrigation District's Board of Directors. The following are minimum standards and <br /> conditions which shall be required to be incorporated as standards notes on the plans: <br /> (1) The land owner agrees not to perform any excavation or grading within the SSJID easement <br /> or within 15 feet of the centerline of the pipeline, whichever is greater. <br /> (2) Excavations adjacent to District easements and/or facilities shall have a minimum 3:1 slope <br /> from the excavated field to the top of the berm. <br /> (3) The landowner will take such steps as are required by the SSJID Water Superintendent to <br /> remedy any erosion on banks adjacent to the District's facilities. <br /> (4) No soil will lie stockpiled over the SSJID pipeline. <br /> San Joaquin County PA-02-370\N & F Farms <br /> Page 12 <br /> Community Development <br />