Laserfiche WebLink
(5) No heavy equipment will travel over the SSJID pipeline without approved bridging, with said <br /> bridging to be approved between SSJID and the contractor. <br /> (6) No trees and/or rubbish will be disposed of or stored on the SSJID easement or facT es. <br /> (7) SSJID will be notified 48 hours in advance of any excavation work. <br /> (8) The land owner agrees that the existing pipeline or concrete lined canal do not presently leak y <br /> and agrees that any damage will be repaired at the land owner's expense. <br /> (9) It is understood by the applicant that the District shall not be held responsible to remedy high <br /> water table problems created by the excavation. <br /> (10)The land owner shall provide the District with sufficient fill dirt from excavations for the <br /> protection of canal or pipeline and place the fill dirt as directed by the District's Engineefing <br /> Department <br /> (11)Any irrigation pipeline or service structure (District or private) installation or modification <br /> necessitated by the proposed excavation shall be performed at the land owner's experese. <br /> Furthermore, the owner shall obtain a Construction Permit and a Structure Permit from the <br /> District prior to installing, modifying, or removing any irrigation pipeline or structure on District <br /> facilities. Additionally, a hydraulic analysis will need to be performed to determine the proper <br /> pipe size for pipelines that are to be relocated to ensure that the same delivery head can be <br /> conveyed through the new pipeline. <br /> (12)New easements shall be conveyed as needed to accommodate the relocation of District <br /> facilities and to provide needed access. <br /> K- f.: <br /> ��SS�� <br /> San Joaquin County PA-02-370\N & F Farms <br /> Community Development Page 13 <br />