My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004096
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
27865
>
2600 - Land Use Program
>
PA-0200370
>
SU0004096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:30 AM
Creation date
9/9/2019 9:06:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004096
FACILITY_NAME
PA-0200370
STREET_NUMBER
27865
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
27865 E RIVER RD
RECEIVED_DATE
10/4/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\APPL.PDF \MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\CDD OK.PDF \MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
some reimbursement for a portion of the costs under the District's pipeline reimbursement policy <br /> implemented for developments. <br /> Therefore, as a condition of approval by the County, it is requested that the owner be required to <br /> submit plans to the District for review and approval by the South San Joaquin Irrigation District's <br /> Board of Directors and comply with all standard District policy requirements concerning pipeline <br /> replacement for developments. In addition, the following are minimum standards and conditions <br /> that have been established by the District for excavations which will be required to be incorporated <br /> as standard notes on the plans: <br /> 1. The landowner agrees not to perform any excavation or grading within the S.S.J.I.D. <br /> easement or within 15 feet of the centerline of the pipeline,whichever is greater. <br /> 2 ExcavatioL>;adjacenttoDistrict easemeutsand urfacilitiesshalihavea.riinimum3:1 <br /> slope from the excavated field to the top of the berm. <br /> 3. The landowner will take such steps as are required by the S.S.J.I.D. Water <br /> Superintendent to remedy any erosion on banks adjacent to the District's facilities. <br /> 4. No soil will lie stockpiled over the S.S.J.I.D. pipeline. <br /> 5. No heavy equipment will travel over the S.S.J.I.D. pipeline without approved <br /> bridging, said bridging to be approved between S.S.J.I.D. and the contractor. <br /> 6. No trees and/or rubbish will be disposed of or stored on the S.S.J.I.D. easement or <br /> facilities. <br /> 7. S.S.J.I.D. will be notified 48 hours in advance of any excavation work. <br /> C8. The landowner agrees that the existing pipeline or concrete lined canal do not <br /> presently leak and agrees that any damage will be repaired at landowner's expense. <br /> 9. it is understood by the applicant that the District shall not be held responsible to <br /> remedy high water table problems created by the excavation. <br /> 10. Landowner shall provide District with sufficient fill dirt from excavation for <br /> protection of canal or pipeline and place fill dirt as directed by District Engineering <br /> Department. <br /> 11. Any irrigation pipeline or service structure (District or Private) installation or <br /> modification necessitated by the proposed excavation shall be performed at the <br /> landowner's expense. Furthermore, owner shall obtain a Construction Permit and <br /> Structure Permit from the District prior to installing, modifying, or removing any <br /> irrigation pipeline or structure on District facilities.Additionally,a hydraulic analysis <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.