My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004096
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
27865
>
2600 - Land Use Program
>
PA-0200370
>
SU0004096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:30 AM
Creation date
9/9/2019 9:06:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004096
FACILITY_NAME
PA-0200370
STREET_NUMBER
27865
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
27865 E RIVER RD
RECEIVED_DATE
10/4/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\APPL.PDF \MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\CDD OK.PDF \MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.� <br /> RECLAMA N PLAN[Rev#2] —Bellino Pit <br /> George Reed, Inc. <br /> Page 3 <br /> I. DESCRIPTION OF ENVIRONMENTAL SETTING (continued) <br /> I. Aesthetics <br /> The area around the project site is primarily rural farmland and ranchettes. The immediate area between the <br /> proposed mine site and the processing facility is all farmland. Visual impact to vehicular traffic driving by will <br /> be limited to Phase I when excavation activities begin along the periphery of River Road and Harrold Avenue. <br /> Once Phase II commences, Phase I will be planted with Almond trees and the remainder of the project along <br /> River Road will be relatively obscured from public view. <br /> J. Other Information <br /> A South San Joaquin Irrigation District underground pipeline crosses through the property. Presently, the <br /> pipeline will remain as mapped out on the Site Plan, with an over-crossing constructed to accommodate haul <br /> traffic. Refer to Section II. (K) [Page 5]of this plan for further information regarding this matter. <br /> II. DESCRIPTION OF PROPOSED MINING OPERATION <br /> A. May Of Operations <br /> Details of the proposed operation are shown on map attached to the application. <br /> B. Estimated Production Schedule' <br /> Product Completion Reclamation <br /> PHASE 1: <br /> t30 Acres 925,000 CY S/G 2007 2009 <br /> 537,000 CY OB <br /> PHASE H: <br /> t15 Acres 425,000 CY S/G 2009 2011 <br /> 278,000 CY OB <br /> PHASE III: 1,080,000 CY S/G 2013 2015 <br /> t26 Acres 495,000 CY OB <br /> PROJECT TOTALS: 2,430,000 CY S/G <br /> 1,310,000 CY O/B <br /> NOTE: Annual Average Mining Quantities- 7.0 Acres/Year <br /> 131,000 CY Overburden/Year <br /> 244 non CY Rnnd k cravnl/Yenr <br />
The URL can be used to link to this page
Your browser does not support the video tag.