My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004096
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
27865
>
2600 - Land Use Program
>
PA-0200370
>
SU0004096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:30 AM
Creation date
9/9/2019 9:06:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004096
FACILITY_NAME
PA-0200370
STREET_NUMBER
27865
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
27865 E RIVER RD
RECEIVED_DATE
10/4/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\APPL.PDF \MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\CDD OK.PDF \MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(5) The State makes one or more of the findings specified in Section 2774.4(a) of the State Public <br /> Resources Code. <br /> (6) In any instance that the County or State makes the demand for partial or full tender of the <br /> financial guaranteeofperformance, the County and/or State may use all or any portion of the <br /> financial guarantee to reclaim the site and to recover its administrative costs associated <br /> therewith. (Development Title Section 9-1415.3[r]) <br /> p. ENFORCEMENT: Except as otherwise provided in State Mining Regulations, the County shall have <br /> authority to enforce provisions of the Surface Mining and Reclamation Act. The County may <br /> exercise all enforcement regulations available under the County Development Title and the State <br /> Public Resources Code. Such enforcement measures include charging the applicant the costs of <br /> administering an enforcement action. The basis for charging fees for an enforcement action shall be <br /> a time and materials compensation. (Development Title Section 9-1415.3(t]) <br /> q GROUNDWATER CONDITIONS: Excavation below groundwater level is not permitted. <br /> r NOISE: The operator shall implement the following measures to reduce the impact of <br /> construction related noise: <br /> (1) All existing and future residences shall have adequate (approximately eight feet tall with 2:1 <br /> slope) berm placement to prevent line of sight to the quarry. Line of sight graphics shall be <br /> included with the Improvement Plan <br /> s RECLAMATION: The site shall be reclaimed to an agricultural use. <br /> t. MERGER: The site consists of four separate parcels. The parcels shall be merger prior to <br /> initiation of the use of the site as a quarry, if applicable. <br /> U STAGING AREA: The applicant shall construct an on-site staging area for both inbound and <br /> outbound trucks to prevent the parking of trucks along the shoulder of River Road. The staging <br /> areas shall be adequate to accommodate at least 12 inbound trucks and 6 outbound trucks. The <br /> staging area shall be paved with an all-weather surface and shall be constructed within one year of <br /> the date of approval of this application. <br /> v. INSPECTIONS: For one year, the applicant shall conduct random daily inspections of trucks to <br /> check for the illegal application of diesel fuel to truck beds. <br /> 2 DEPARTMENT OF PUBLIC WORKS (Staff Contact. Gabe Karam, 468-3000) <br /> a. The excavation plan shall be prepared by a registered civil engineer and include the following: <br /> (1) Detail of access road off of Harrold Avenue. <br /> (2) Stockpile area for top soil (no excavation or stockpile shall be allowed within 25 feet of the <br /> property boundary or the County right-of-way). <br /> (3) Public roads shall be kept free from mud, dirt, and gravel resulting from quarry operations. <br /> b. All private roads involved in the excavation shall be maintained to control dust. <br /> c. A conveyor system extending under River Road shall be installed and used to move material from <br /> the project site to the existing Munn & Perkins plant on River Road. <br /> Conditions of Approval - 4 - PA-02-370 <br />
The URL can be used to link to this page
Your browser does not support the video tag.