Laserfiche WebLink
d. An encroachment permit shall be required for work within the road right-of-way. (Development <br /> Title Sections 9-1145.4 and 9-1145.5) <br /> e. Dedication to result in a 25-foot-wide right-of-way from the centerline of Harrold Road to the <br /> property line shall be required across the frontage of APN 247-230-09. Dedication shall be made <br /> on the Site Map. (Development Title Section 9-1150.5) <br /> 3 ENVIRONMENTAL HEALTH DEPARTMENT (Staff Contact: Larry Godinho, 468-0330) <br /> a. No excavations are permitted into the ground water table without specific approval from the <br /> Regional Water Quality Control Board, Central Valley Region (California Water Code, Chapter 4, <br /> Article 3, Section 13240). <br /> b. The materials from an excavation shall not be deposited into any watercourse or in any way <br /> contribute to the pollution thereof(California Water Code, Section 13376). <br /> c. An approved potable water supply must be provided for all employees (Development Title Section <br /> 9-1100.1). <br /> d Approved sanitary facilities must be provided for all employees (Development Title Section 9- <br /> 1100.1). <br /> 4 SOUTH SAN JOAQUIN IRRIGATION DISTRICT (Staff Contact: Sam Bologna, 823-3101, ext. 111) <br /> a. The owner shall be required to replace the existing pipeline and relocate it to a location along the <br /> outer perimeter of the excavation. <br /> b. The owner shall be required to submit plans to the district for review and approval by the South <br /> San Joaquin Irrigation District's Board of Directors. The following are minimum standards and <br /> conditions which shall be required to be incorporated as standards notes on the plans <br /> (1) The land owner agrees not to perform any excavation or grading within the SSJID easement <br /> or within 15 feet of the centerline of the pipeline, whichever is greater. <br /> (2) Excavations adjacent to District easements and/or facilities shall have a minimum 3:1 slope <br /> from the excavated field to the top of the berm. <br /> (3) The landowner will take such steps as are required by the SSJID Water Superintendent to <br /> remedy any erosion on banks adjacent to the District's facilities. <br /> (4) No soil will lie stockpiled over the SSJID pipeline. <br /> (5) No heavy equipment will travel over the SSJID pipeline without approved bridging, with said <br /> bridging to be approved between SSJID and the contractor. <br /> (6) No trees and/or rubbish will be disposed of or stored on the SSJID easement or facilities <br /> (7) SSJID will be notified 48 hours in advance of any excavation work. <br /> (8) The land owner agrees that the existing pipeline or concrete lined canal do not presently leak <br /> and agrees that any damage will be repaired at the land owner's expense <br /> (9) It is understood by the applicant that the District shall not be held responsible to remedy high <br /> water table problems created by the excavation. <br /> Conditions of Approval - 5 - PA-02-370 <br />