Laserfiche WebLink
(10)The land owner shall provide the District with sufficient fill dirt from excavations for the <br /> protection of canal or pipeline and place the fill dirt as directed by the District's Engineering <br /> Department. <br /> (11)Any irrigation pipeline or service structure (District or private) installation or modification <br /> necessitated by the proposed excavation shall be performed at the land owner's expense <br /> Furthermore, the owner shall obtain a Construction Permit and a Structure Permit from the <br /> District prior to installing, modifying, or removing any irrigation pipeline or structure on District <br /> facilities. Additionally, a hydraulic analysis will need to be performed to determine the proper <br /> pipe size for pipelines that are to be relocated to ensure that the same delivery head can be <br /> conveyed through the new pipeline. <br /> (12)New easements shall be conveyed as needed to accommodate the relocation of District <br /> facilities and to provide needed access. <br /> c. The applicant and the South San Joaquin Irrigation District shall enter into a Developers Agreement <br /> for the property identified by APN 247-230-09. <br /> Conditions of Approval -6 - PA-02-370 <br />