Laserfiche WebLink
(7) SSJID will be notified 48 hours in advance of any excavation work. <br /> (8) The land owner agrees that the existing pipeline or concrete lined canal do not presently leak <br /> and agrees that any damage will be repaired at the land owner's expense. <br /> (9) It is understood by the applicant that the District shall not be held responsible to remedy high <br /> water table problems created by the excavation. <br /> (10)The land owner shall provide the District with sufficient fill dirt from excavations for the <br /> protection of canal or pipeline and place the fill dirt as directed by the District's Engineering <br /> Department. <br /> (11)Any irrigation pipeline or service stricture (District or private) installation or modification <br /> necessitated by the proposed excavation shall be performed at the land owner's expense. <br /> Furthermore, the owner shall obtain a Construction Permit and a Structure Permit from the <br /> District prior to installing, modifying, or removing any irrigation pipeline or structure on District <br /> facilities. Additionally, a hydraulic analysis will need to be performed to determine the proper <br /> pipe size for pipelines that are to be relocated to ensure that the same delivery head can be <br /> conveyed through the new pipeline. <br /> (12)New easements shall be conveyed as needed to accommodate the relocation of District <br /> fanilitipm nnfl to nmviria nnuriori �nnnoc <br />