My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002496 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROBINSON
>
13124
>
2600 - Land Use Program
>
SA-01-23
>
SU0002496 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:15 AM
Creation date
9/9/2019 9:08:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0002496
PE
2633
FACILITY_NAME
SA-01-23
STREET_NUMBER
13124
Direction
S
STREET_NAME
ROBINSON
STREET_TYPE
RD
City
ESCALON
ENTERED_DATE
10/29/2001 12:00:00 AM
SITE_LOCATION
13124 S ROBINSON RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROBINSON\13124\SA-01-23\SU0002496\NL STDY MGMT PLN.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I ' I I t I I I I <br /> Faria Dairy#130 Site Precipitation/Evaporation Calculations 130-11 waste charts.phase I <br /> Nutrient/Flush Lagoon <br /> Phase I <br /> Monthly Rainfall For Location (Inches) <br /> Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug. Sep. <br /> 0.70 1 80 2.00 260 1.70 1 60 1.00 0.10 0.10 0.10 0.10 020 <br /> Monthly Pond/Lagoon Evaporation Rates for Location(Inches) <br /> Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug. Sep. <br /> 3.87 1 62 088 1 11 1.88 3.63 6.37 8.13 8.75 963 963 650 <br /> Monthly Site(roof/concrete/yard/corral/ACI landscape) Evaporation Rates for Location (inches) <br /> 0.70 1.62 0.88 1 11 1 70 160 1 00 0.10 0.10 010 010 020 <br /> Monthly Evaporation From Evaporation Field (inches): <br /> 2.47 0.00 0.00 0.00 0.00 0.00 4.37 7.93 8.55 943 9.43 610 <br /> i <br /> Rainfall Area (sq.ft.)& Monthly Corral Evaporation <br /> Actual %of Runoff Weighted sq.ft.for rainfall %of Evaporation Weighted Sq. Ft.for evap. Evaporation Field Information <br /> Roof:,, 100% 11388 0% 0 <br /> Concrete �1 : 100% 60114 5% 3006 Evaporation field <br /> Yard jr 84,609 15% 12691 0% 0 %of monthly evap. Q.O0 <br /> Corrals f ,: 15% 27194 0% 0 <br /> AC 10 95% 0 0% 0 <br /> LagoonQO: 100% 86700 100% 86700 <br /> Sett. Pond M., 100% 35892 100% 35892 <br /> Landscape ) Y L i r 10°x6 0 0% 0 <br /> Total Sq. Ft: 459,998 sq.ft 233980 sq.ft. 125598 sq.ft. <br /> Rainfall into system for Month (gals) <br /> Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug. Sep. <br /> 102,093 262,525 291,695 379,203 247,940 233,356 145,847 14,585 14,585 14,585 14,585 29,169 <br /> l <br /> Evaportaion from Nutrient/Flush Lagoon and Settling Ponds (gals) <br /> 295,729 123,793 67,246 84,821 143,661 277,389 486,768 621,259 668,637 735,883 735,883 496,702 <br /> Evaportaion for site(gals) <br /> 1,311 3,035 1,649 2,080 3,185 2,998 1,874 187 187 187 187 375 <br /> Evaporation at evaporation field (gals) <br /> i <br /> Penn 1 <br /> Site Precipitation/Evaporation Calculations <br /> VID <br />
The URL can be used to link to this page
Your browser does not support the video tag.