Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-03-429 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable <br /> at the time of building permit application. (The fee currently is $650.00 per 1,000 gross square foot of <br /> building designated as Manufacturing in the Thornton area. The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record.) (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 6. Applicant shall apply for STAA terminal access if applicable to this operation. Truck parking shall be <br /> provided on-site for all trucks in operation. <br /> 7. All new structures and/or substantial improvements constructed on this parcel shall be elevated a <br /> minimum of one (1) foot above the 100-year flood elevation of eight(8) feet. <br /> 8. A State National Pollutant Discharge Elimination System (NPDES)Construction Permit Notice of <br /> Intent(NOI) shall be filed with the State Water Resources Control Board if over one (1) acre of total <br /> ground is disturbed. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1)acre of soil shall require a <br /> State NPDES construction permit. <br /> DTP:DG:ar <br /> P.\COMMENTS\SA\YR 2003\PA-0300429.wDd <br />