Laserfiche WebLink
Existing Plus Project Conditions Table <br /> LOS Impact <br /> Analysis Fee without LOS with Mitigated Significance <br /> Impact Location Year Jurisdiction Payment Mitigation Measure Project Project LOS after Mitigation <br /> Lathrop Road/1-5 Southbound install traffic signal and coordinate the signals at LOS F LOS F LOS C Significant and <br /> TITANS-1 Ramps Existing Caltrans RTIF the NB and SB ramp intersections Unavoidable <br /> Lathrop Road/1-5 Northbound Instill traffic signal and coordinate the signals at LOS F LOS F LOS C Significant and <br /> TRANS-2 Ramps Existing Caltrans RTIF the NB and SB ramp intersections Unavoidable <br /> TRANS-3 French Camp Road/SR 99 ExistingCaltrans N/A No feasible mitigation measure.Traffic signal LOS E LOS E N/A Significant and <br /> Southbound Ramps warrants are not met. Unavoidable <br /> TRANS-4 Southbound Ramp Diverge(alp Existing Caltrans RTIF Co¢stmct additional lane on southbound SR 99 LOS D LOSE LOS D Significant and <br /> SR 99/French Camp Road between Fre¢ch Camp Road and Lathrop Road Unavoidable <br /> V <br />