Laserfiche WebLink
Year 2021 Plus Project(Phase I& II) Conditions Table <br /> Impact <br /> Impact Location Analysis urisdiction Fee Mitigation Measure without LOS LOS with Mitigated Significance <br /> P Year Payment g Project Project LOS after Mitigation <br /> RTIF and <br /> Roth Road/I-5 Southbound Install traffic signal and coordinate the signals at LOS F LOS F LOS C <br /> Significant and <br /> TRANS-8 Ramp 2021 Caltrans Fair Shaze Payment the NB and SB ramp intersections Unavoidable <br /> made[o <br /> County <br /> RTIF and <br /> TRANS-9 Roth Road/I-5 NorthbounFair Shared 2021 Caltrans Payment Install traffic signal and coordinate the signals at LOS F LOS F LOS B Significant and <br /> Ramp made to the NB and SB ramp intersect. U <br /> ons Unavoidable ble <br /> County <br /> Fair Share Install traffic signal and convert the northbound, <br /> TRANS-10 Roth Road/l Iatlan Road 2021 City of Payment southbound and westbound approaches to LOS F LOS F LOS C Significant and <br /> Lathrop made to provide a separate left-mm lane and a shared Unavoidable <br /> County through-right tum lane. <br /> Install traffic signal,construct an additional left- <br /> tum lane on the westbound and southbound S' cant and <br /> TRANS-11 Lathrop Road/1-5 Southbound 2021 Caltrans RTIF approaches,and convert die eastbound approach LOS F LOS F LOS D <br /> Ramps to provide a separate through and separate right- Unavoidable <br /> Men lane. <br /> Install traffic signal,construct an additional left- <br /> mm lane on the eastbound approach,convert the <br /> TRANS-12 Lathrop Road/1-5 Northbound 2021 Caltrans RTIF °Ubotmd approach to provide a shared left- LOS F LOS F LOS C Significant and <br /> tum/through lane and a free right-tum lane,and Unavoidable <br /> convert the westbound approach to provide <br /> separate thtough and right-tum lanes. <br /> TRANS-13 French Camp Road/SR 99 2021 Caltrans RTIF Install traffic signal. LOS F LOS A LOS C Significant and <br /> Southbound Ramps Unavoidable <br />