Laserfiche WebLink
Mitigation Measures and Statements of Findings of Impacts Being Monitorin I Responsible <br /> 9 8 P 9 9 MonitoringlReporting <br /> Significant and Unavoidable Reporting Action Party for Providing Responsibility Timing <br /> Mitigation <br /> NOISE-1a through NOISE-1d. <br /> 4.5 Aesthetics <br /> AESTHETICS-1:All lighting shall be effectively shielded to prevent spillage County staff to review within Union Pacific San Joaquin County Prior to issuance of building <br /> beyond the area requiring lighting for safety and operational purposes.No lighting 30 days of lighting Community Development permits for Phase I <br /> shall be directed off the site or placed directionally so that lighting would shine installation Department <br /> outwards during project operations.Specifications for lighting shall be provided <br /> for County staff review at the time of the first building permit issued for Phase I <br /> construction.County staff shall complete a site review within 30 days of lighting <br /> installation to ensure that no excess spillage of light occurs off the site and that <br /> any off-site lighting at nearby parcels is less than one-half foot candle at the most. <br /> Less than significant impact after implementation of Mitigation Measure <br /> AESTHETICS-1. <br /> AESTHETICS-2:The project applicant shall implement Mitigation Measure County staff to review within Union Pacific San Joaquin County Prior to issuance of building <br /> AESTHETICS-1. 30 days of lighting Community Development permits for Phase I <br /> Less than significant impact after implementation of Mitigation Measure installation Department <br /> AESTHETICS-1. <br /> 4.6 Biological Resources <br /> 8I0-1a:Sweinson's Hawk Avoidance Measures.Prior to development,the Verification by County. Union Pacific San Joaquin County Prior to project construction <br /> applicant shall determine the nearest Swainson's hawk nest location via the Community Development activities <br /> California Natural Diversity Data Base(CNDDB)(CDFG, 1994)to determine Department and San <br /> the foraging radius relative to the project site.Pre-construction Swainson's Joaquin Council of <br /> hawk surveys shall also be conducted by a qualified biologist during the Governments if participation <br /> appropriate time of year using approved methods. Provisions that would is sought in the SJMSCP <br /> reduce impacts to less-than-significant levels are described in Appendix W, <br /> State Fish and Game Staff Report Regarding Mitigation for Impacts to <br /> Swainson's hawk in the Central Valley of the staff report on Swainson's hawk <br /> (CDFG, 1994);summaries pertaining to the proposed project are provided <br /> below: <br /> 1. No intensive new disturbances(e.g.,heavy equipment operation associated <br /> with construction)or other project-related activities that may cause nest <br /> abandonment or forced fledging shall be initiated within one-quarter mile <br /> (buffer zone)of an active nest between March 1—September 15 or until <br /> August 15 if a Management Authorization or Biological Opinion is obtained <br /> for the project.If construction or other project-related activities that may <br /> cause nest abandonment or forced fledging are necessary within the buffer <br /> zone,monitoring of the nest site(funded by the project applicant)by a <br /> qualified biologist(to determine if the nest is abandoned)shall be required. <br /> If the nest site is abandoned and if the nestlings are still alive,the project <br /> applicant shall fund the recovery and hacking(controlled release of captive <br /> reared young)of the nestling(s).Nest trees shall not be removed unless <br /> there is no feasible way of avoiding removal. <br /> 4.6 Biological Resources(cont.) <br /> 2. To mitigate for the loss of foraging habitat, project applicant shall provide <br />