My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007882
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0007882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 4:26:04 PM
Creation date
9/9/2019 9:09:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007882
PE
2627
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
APN
19802004 07
ENTERED_DATE
8/25/2009 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
8/24/2009 12:00:00 AM
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH COND.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Responsible <br /> Significant <br /> Measures and Statements of Findings of Impacts Being p Monitoring/Action <br /> Party for Providing Monitoring/Reporting <br /> lRbility g Timing <br /> Significant and Unavoidable Reporting Action Mitigation Responsibility g <br /> AIR-3: Implement Mitigation Measures AIR-2a,AIR-2b,AIR-2c,AIR-2d,and Verification by County. Union Pacific Union Pacific with During project operations <br /> AIR-2e.Mitigation measures potentially applicable to the project were reviewed verification provided to San <br /> under Impact AIR-2.Because the candidate mitigation measures reduce both Joaquin County Community <br /> criteria pollutant emissions as well as emissions of air toxics(DPM),the same Development Department <br /> measures that were feasible to implement under Impact AIR-2 are also <br /> considered mitigation measures for Impact AIR-3. <br /> Less than significant impact after Implementation of Mitigation Measures <br /> AIR-2a through AIR-2e. <br /> 4.3 Alr Quality and Greenhouse Gases(cont.) <br /> AIR-4: Implement Mitigation Measures AIR-2a,AIR-2b,AIR-2c,AIR-2d,and Verification by County. Union Pacific Union Pacific with During project operations <br /> AIR-2e.Mitigation measures potentially applicable to the project were reviewed verification provided to San <br /> under Impact AIR-2.Because the candidate mitigation measures would reduce Joaquin County Community <br /> both criteria pollutant emissions as well as emissions of air toxics(DPM),the Development Department <br /> same measures that were feasible to implement under Impact AIR-2 are also <br /> considered mitigation measures for Impact AIR-4. <br /> Less than significant impact after implementation of Mitigation Measures <br /> AIR-2a through AIR-2e. <br /> 4.4 Noise <br /> NOISE-1a:Reduce truck rebound Impact noise by removing speed bumps and Verification by County. Union Pacific Union Pacific with During project operations <br /> by posting large,clearly visible signs requiring drivers to observe maximum verification provided to San <br /> allowable speeds. In addition,install radar-operated or induction-loop operated Joaquin County Community <br /> large electronic speed indicator signs with rapidly flashing alerts in case of Development Department <br /> speed violations to clearly signal drivers their current speed. <br /> In addition,maintain the roads so as to reduce truck vibration due to surface <br /> roughness,expansion joint gaps,cracks and holes that would otherwise <br /> generate impact noise. <br /> NOISE-1 b:Reduce container landing impact noise by requiring crane operators <br /> to utilize softwarelsensor controls to tightly control descent speeds in the last few <br /> seconds before impact. <br /> NOISE-1c:The applicant shall test the feasibility of utilizing electric hybrid <br /> cranes as an alternative to diesel powered gantry cranes and shall incorporate <br /> such hybrid cranes into the project's operations if the applicant determines they <br /> are operationally and economically feasible. <br /> NOISE-1d:The applicant shall replace the current single-tone backup alarms <br /> used in Gantry Cranes and other vehicles with Ambient-Sensitive Self-Adjusting <br /> Backup Alarms,which automatically increase or decrease their volume based <br /> upon background noise levels to ensure that the tone produced is no louder than <br /> necessary.Applicant should also test the safety implications of replacing single- <br /> tone backup alarms with less intrusive broadband noise types and determine if <br /> such replacement is feasible without compromising yard safety <br /> Less than significant impact after implementation of Mitigation Measures <br />
The URL can be used to link to this page
Your browser does not support the video tag.