Laserfiche WebLink
KLEINFELDER <br /> these pipelines would typically be the responsibility of the pipeline companies. Prior to <br /> site development, the local utility should be contacted. <br /> 11)There is one active septic system located on the subject site. The purpose of the septic <br /> systems is to receive domestic sewage. It is common to find that unauthorized or <br /> unintended discharge to septic systems of hazardous materials or petroleum projects has <br /> `- occurred. If the septic system is going to become inactive, it must be abandoned in <br /> accordance with applicable regulations. Soil samples can be collected in the vicinity of <br /> the septic tank and leach lines to evaluate potential hazardous materials discharge with <br /> the septic system. If additional sampling is not conducted, the signatories of this report <br /> should be contacted if contamination is suspected during proper septic system <br /> abandonment. <br /> r, 8.3. DEVIATIONS <br /> No significant deviations were made from the ASTM E 1527-00 practice. No other"non-scope" <br /> �- considerations, such as asbestos-containing materials, radon, lead-based paint, lead in drinking <br /> water, wetlands, regulatory compliance, cultural and historic resources, industrial hygiene, health <br /> and safety, ecological resources, endangered species, indoor air quality and high voltage <br /> powerlines were considered for this report. <br /> 6. <br /> L <br /> ►. <br /> 4035I.P0I /ST04R354 Page 29 of 30 <br /> Copyright 2004,Kleinfelder, Inc. March 12,2004 <br />