B. Proposed Wastewater Disposal System Overview and Design Specifications <br /> The following describes the proposed new wastewater management system sequentially starting <br /> with the existing septic and grease trap tanks, which will remain. The effluent will then gravity <br /> flow into a new pump basin with a BioTube® Filter Pump Vault and a duplex pump system. <br /> i. Septic Tank Hydraulic Detention Time Calculation <br /> Detention Time= 1600 gal septic tank capacity x 0.70 (30%volume lost to sludge/scum accumulation) <br /> 2.5 (Peaking Factor)x 350 gals/day ADF <br /> Detention Time= 1.3 days. The minimum acceptable detention time is 1.0 days. This excludes <br /> hydraulic retention time that can be attributed to the grease trap tank. <br /> ii. New Disposal System Design Parameters and Appurtenances <br /> All components and part numbers (Orenco/Pace Supply) are specified on the plans. The effluent <br /> will be filtered by the BioTube filter vault before pressurization for disposal through the lateral <br /> orifices. The duplex pump system within the BioTube will alternate between on/off. Total <br /> effluent volume can be verified by checking pump cycle times on the panel to ensure both pumps <br /> distributed effluent equally. <br /> Laterals in the filter bed are to consist of 7 laterals of varying length (See plans), but with an <br /> average length for calculation purposes of 12.6 ft. Sch. 40 PVC 1.0" nominal diameter, 1/8" <br /> orifices directed at 12 o'clock, 3.0 ft spacing. Flushing assemblies are to be installed at the ends <br /> of each lateral for clean-out and contained within valve cover boxes. Geotechnical filter fabric <br /> must be installed over the drain rock after 2 inches of rock has been placed over the laterals with <br /> orifice shields. <br /> The "Pump Selection for a Pressurized System Parameters and Chart"found in Appendix E <br /> illustrates the selected parameters for the new disposal system, along with the calculations for <br /> frictional head loss, pipe volumes and pump curve. If the manifold and laterals are ultimately <br /> installed at a higher elevation than the transport line, a check valve must be installed either on the <br /> transport line or discharge assembly. <br /> iii. Primary and 100% Replacement Effluent Disposal Area <br /> Filter bed area is calculated by the procedure described in Section 8.7 of the San Joaquin County <br /> Sewage Standards and EHD Document 42-01-004: <br /> Calculation Requirements for Commercial Septic Systems: <br /> Base Tank Capacity (BTC)= 1,200 gals <br /> Lineal Feet of Leachline (LFLL) = 1,200 BTC+ 350 ADF x 0.225 Silt SF = 350 LFLL. <br /> 350 LFLL x 3 = 1,050 sq. ft. filter bed. Due to area constraints imposed by the neighboring <br /> domestic well to the southwest, only half of the area available for disposal can be used, as <br /> depicted on the engineering plans and discussed in the Conclusions Section of this report. <br /> Page -3- <br /> Chesney Consulting <br />