Laserfiche WebLink
Item No. 2 <br /> PC: 1-2-92 <br /> UP-91-21 <br /> Page 2 <br /> PROJECT DESCRIPTION <br /> This request is for a Use Permit application to establish a church facility in two phases. Phase I will be <br /> composed of the conversion of an existing structure on the site to an 81-seat sanctuary, and Phase II will <br /> be composed of the construction of a new 150-seat sanctuary and the conversion of the Phase I structure <br /> to classroom or dining hall use. The existing meeting hall contains approximately 1,652 square feet, and <br /> the proposed church will contain approximately 4,500 square feet. The facility will be provided access <br /> in Phase I by a driveway on Seventh Street, while access in Phase II will be provided by that driveway and <br /> a second one to be constructed on 'D'Street. The church will be served by the following services: water <br /> supply by a private well, sewage disposal by a septic system, and storm drainage to be retained on the <br /> site. <br />