Laserfiche WebLink
oPQuIN c <br /> COUNTY OF SAN JOAQUIN <br /> EUGENE DELUCCHI <br /> N: < DEPARTMENT OF PUBLIC WORKS CHIEF DEPUTY DIRECTOR <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE THOMAS R.FLINN <br /> STOCKTON.CALIFORNIA 95201 DEPUTY DIRECTOR <br /> Oq FORa�Q (209)468-30DEPUTYELLOPoEZ <br /> 0 <br /> HENRY M. HIRATA I D21 RICHARD C.PAYNE <br /> DIRECTOR DEPUTY DIRECTOR <br /> July 17, 1991 JUL 171991 <br /> M_E_M_0_R_A_N_D_U_M COMMUNITY DbEL0FN;EN1'DEPT'. <br /> PLANNING DIVISION <br /> TO : Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> FROM : Charles Kelley, Senior Civil En i <br /> Public Services Division <br /> SUBJECT : UP-91-21 PRE-APPLICATION Use Permit for a church, <br /> located on the W. side of Seventh St . , 270 feet S . of "F" St. , <br /> Banta. <br /> APPLICANT : Saint Nirankari Mission APN : 250-070-2 <br /> INFORMATION: <br /> The site is not located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area. <br /> "D" Street has an existing right-of-way width of 50 feet, and a <br /> planned right-of-way width of 50 feet. <br /> Sixth Street has an existing right-of-way width of 50 feet, and a <br /> planned right-of-way width of 50 feet. <br /> Seventh Street has an existing right-of-way width of 50 feet, and <br /> a planned right-of-way width of 50 feet. <br /> ORDINANCE REQUIREMENTS : <br /> 1 . An Improvement Plan, prepared by a Registered Civil engineer , <br /> showing drainage, driveway access details, on-site parking, <br /> existing and proposed utility services, and grading, shall be <br /> submitted to the Department of Public Works for approval . <br /> Storm drainage shall be retained on-site, runoff and pond <br /> capacity calculations shall be submitted for approval . <br /> 2 . Encroachment permit shall be required for work within road <br /> right-of-way . <br /> 1 <br />