Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-95-31 <br /> 3 . The frontage improvements for Shaw Road shall be <br /> constructed in conformance with the standards for one-half <br /> of a 60-foot right-of-way local industrial street . The <br /> construction of the frontage improvements will be deferred <br /> upon execution by the owner of a Deferred Frontage and <br /> Roadway Improvement Agreement or a Secured Deferred <br /> Frontage and Roadway Improvement Agreement with a deposit <br /> equivalent to their estimated construction costs prior to <br /> approval of the Improvement Plan. (A $260 . 00 fee <br /> currently is required for processing per Development Title <br /> Table 9-240 . 2 in addition to a copy of the Grant Deed and <br /> an estimate for the required frontage improvements . The <br /> estimate shall be prepared by a Registered Civil Engineer <br /> with a typical section drawing on a form to be supplied by <br /> the Department of Public Works and submitted to the <br /> Department of Public Works for approval . As an option, <br /> the Department of Public Works will prepare the drawing <br /> and estimate for an additional fee of $115 . 00 . ) <br /> (Development Title Section 9-1150 . 2) <br /> 4 . The Traffic Impact Mitigation Fee will be required for <br /> this development . The fee is due and payable at the time <br /> of building permit application. (The fee currently is <br /> $197 . 91 per additional daily trip-end generated in the <br /> Stockton area. The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record. ) <br /> (Resolutions R-90-304 , R-91-1025 , R-93 -167 and R-94-174) <br /> TMI :RH: lt <br /> PS-51196.c: <br /> E : Manuel Lopez , Deputy Director/Development <br />