Laserfiche WebLink
z� <br /> COUNTY OF SAN JOAQUIN <br /> EUGENE DELUGCHI <br /> y: < DEPARTMENT OF PUBLIC WORKS 0 NEF OEPU TY DIRECTOR <br /> , P.O.BOX 1810-1810 E.HAZELTON AVENUE THOMAS R.FLINN <br /> STOCKTON.CALIFORNIA 95201 DEPUTY DIRECTOR <br /> Cq :O R ? (209)468-3000 MANUEL LOPEZ <br /> FAX(209)468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> August 21, 1995 <br /> l(v,� <br /> it <br /> M - - -QRANNUM AUG 21 <br /> 1995 <br /> TO: Thomas M. Gau, Senior Civil Engineer GUMMUN"ry DEVELUr <br /> Community Development Department PLANNINGN►cNTDC1'7' <br /> CONTACT PERSON: Chandler Martin DIVI$1pN <br /> FROM: Tom M. Iwamiya, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: GX-95-01 AN AGRICULTURAL EXCAVATION APPLICATION TO EXCAVATE <br /> APPROXIMATELY SEVEN ACRES ADJACENT TO THE CALAVERAS RIVER <br /> AND LOCATED IN A 100-YEAR FLOOD AREA EAST OF SHELLEY ROAD. <br /> (DISTRICT 4) . <br /> APPLICANT: Dewey George APN: 067-290-14 <br /> INFORMATION: <br /> A portion of the site is located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area. The 100-year Flood <br /> Elevation has a range of approximately 147 and 150 feet NGVD. In <br /> addition, the existing San Joaquin County and City of Stockton Flood <br /> Insurance Studies, which delineate flood risks, floodplains, and <br /> floodway areas, are currently being reevaluated. The reevaluation is <br /> being conducted by the Federal Emergency Management Agency, Region IX, <br /> Building 105, Presidio of San Francisco, California 94219, telephone <br /> (415) 923-7186 . The reevaluation may delineate additional flood <br /> risks . The official flood maps are available for review at the <br /> Department of Public Works, 1810 East Hazelton Avenue, Stockton. <br /> These flood maps will be updated when the reevaluation process is <br /> completed. <br /> Shelley Road has an existing right-of-way width of 40 feet and a <br /> planned right-of-way width of 50 feet. <br /> RECOMMENDATIONS : <br /> 1. All excavated material shall be stockpiled outside the 100-year <br /> floodplain. <br /> 2 . A Watercourse Encroachment Permit shall be required from the <br /> Water Resources/Flood Control Division prior to any work within <br /> the existing stream channels . <br /> TMI :RH: lt <br /> PS-S3202.C5 <br /> E: Manuel Lopez, Deputy Director/Development <br />