Laserfiche WebLink
ULI—GG—"7G 1HU 11:4t)M Ill:t)J VUHrUV C.14UIYC ILL NU:,1UJ 743—(G40 SO(7 r1ul <br /> SJCAPCD <br /> Suggested Mitigation Measures . <br /> Page 2 <br /> 3) Use of petroleum-based dust palliative shall meet the <br /> road oil requirements of the District' s Rules 409 . 5 <br /> Cutback Asphalt Paving Materials. <br /> 4) Streets adjacent to the project site should be swept as <br /> needed to remove silt which may have accumulated from <br /> construction activities. <br /> D. At all times, ozone precursor emissions should be controlled <br /> by the following methods: <br /> 1) All internal combustion engine driven equipment should <br /> he prcperly maintained and well tuned according to <br /> manufacturers specifications . <br /> 2) During the smog season (May through October) , the <br /> construction period should be lengthened so as to <br /> minimize the number of vehicles and equipment operating <br /> at the same time. <br /> Post•lk�brand fax transmittal memo 7671 r of wa« <br /> -rJ. CH.+ry Pif.••.•rw•G 7, I,crf!/l .rtrijiCJ AP[ <br /> o.w" <br /> ..rte 4�d' �i6 j F..r�o S'�rr A6J:c <br />