Laserfiche WebLink
-2- <br /> b. A National Pollution Discharge Elimination System permit <br /> will be required if storm run-off drains into North <br /> Littlejohns Creek. Discharge of processed water will not <br /> be allowed into the storm drain detention system. <br /> (Development Title Section 9-1125. 2 , 1125. 3) <br /> C. The Water Supply Facilities Impact Mitigation Fee will be <br /> required for this development. The fee is due and <br /> payable at the time of building permit application. (The <br /> fee currently is $88 . 89 per 1, 000 gross square foot of <br /> building as "Manufacturing" . The fee shall be <br /> automatically increased on January 1 of each year at the <br /> rate of 6. 9 percent. An additional 3 . 5 percent shall be <br /> added to the fee upon payment for processing and <br /> administering the program. (Resolution R-91-327) <br /> 3 . SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT: <br /> a. The use of any equipment that causes air pollution will <br /> require an Authority to Construct and Permit to Operate <br /> from the District prior to its use. <br /> b. The applicant shall implement the District' s Dust Control <br /> Practices during on-site grading and construction. <br /> Note: A copy of the District' s letter is attached for <br /> your information. <br /> 4 . FRENCH CAMP FIRE DISTRICT: <br /> a. An exit door shall be mounted in the approved building' s <br /> west rolling door. <br /> b. There shall be no storage of flammable or combustible <br /> liquids inside of the approved building. <br /> C. A fire extinguisher shall be mounted near each exit door <br /> of the approved building. <br /> 5. COUNCIL OF GOVERNMENTS: <br /> a. Approval from the Federal Aviation Administration shall <br /> be required if the height of the approved building <br /> exceeds forty-five (45) feet. <br /> 4 <br />