Laserfiche WebLink
tree for each 30 feet of frontage . The northerly 490 <br /> feet of this landscaping shall be six feet in height <br /> and 75 percent opaque within three years of installa- <br /> tion. <br /> b. One tree shall be planted for each 50 linear feet <br /> adjacent to the north and south property lines . <br /> c . One tree shall be planted for each 8 parking stalls to <br /> provide shade . <br /> d . A permanent , automatic sprinkler system shall be <br /> installed for all non-drought tolerant plants . <br /> e . =___ 'andscaping details shall be detailed on a <br /> landscape plan . <br /> 3 . Trash enclosures shall be designated on the improvement <br /> plans and shall be of solid construction. <br /> 4 . One free-standing monument type sign in accordance with <br /> Section 9-3600 of the Planning Title is allowed. <br /> 5 . All manufacturing, fabricating, and assembling shall be <br /> conducted in the area labeled "production canopy" on the <br /> site plan. <br /> 6 . The storage area shall be improved with compacted rock <br /> base . The type and amount of the base shall be based on <br /> a soils analysis . <br /> 7 . The applicant shall adhere to the Standards for Flood <br /> Hazard Reduction as stated in Section 9-10325 of the San <br /> Joaquin County Planning Title . <br /> 8 . If the Manteca-Lathrop Fire Protection District approves <br /> establishment of the use without construction of the <br /> canopy, the canopy shall be constructed within six months <br /> of the establishment of the use . <br /> II . Department of Public Works : <br /> 1 . A storm drainage facilities plan for the area bounded by <br /> the north line of Lathrop Acres, Roth Road, Southern <br /> Pacific Railroad Company tracks, and Interstate 5 shall <br /> be submitted. <br /> 2 . A storm drainage system shall be constructed in confor- <br /> mance with the approved master storm facilities plan of <br /> Condition No . 1 , above . The construction of the storm <br /> drainage system will be deferred upon execution by the <br /> applicant of a recordable document committing property to <br /> participate in future construction of storm drainage <br /> facilities in an equitable share . <br /> Conditions of Approval - 2 - (SA-89-45 ) <br />