Laserfiche WebLink
Apr - 4. 2006 2:33PM CA DEPARTMENT OF TRANSPORTATION No -5UH P . 3 <br /> � J <br /> Mr. Hatef <br /> April 4, 2006 <br /> Page 2 <br /> • The Department endeavors to maintain a target level of service (LOS) at the transition <br /> between LOS C and LOS D on State highway facilities, including intersections (see <br /> Appendix "C-3" of the TIS guide). If an intersection is currently below LOS "C," <br /> any increase in delay from project-generated traffic should be analyzed and mitigated, <br /> The LOS for operating State highway facilities is based upon measures of <br /> effectiveness (MOE) (see Appendix "C-2" of the Guide). If an existing State <br /> highway facility is operating at less than this target LOS, the existing MOE should be <br /> maintained. <br /> • To avoid delay during the Department's review of the TIS, please provide in an <br /> electronic format the traffic microsimulation software files (both input and output) <br /> that were used to develop the TIS.. <br /> • The Department recommends that the Lead Agency encourage the developer to <br /> submit a scope of work for conducting the TIS prior to circulating the local <br /> development application for comment in order to expedite the Department's review. <br /> The Department is available is discuss assumptions, data requirements, study <br /> scenarios, and analysis methodologies prior to beginning the TIS. This will help <br /> insure that a quality TIS is prepared.. <br /> • This proposed development may not create a major impact on state facilities when <br /> considered by itself. However,when combined with the cumulative impacts of other <br /> existing and proposed development in this area, the resulting traffic will contribute to <br /> the significant congestion. forecasted to the SR-12 mainline and at the intersection of <br /> SR-1.2/Star Street. Therefore, the Department recommends the collection of impact <br /> fees on a "Fair Share" basis for future improvements to these facilities. <br /> If you have any questions or would Re to discuss our comments in more detail, please <br /> contact Dan Brewer at(209) 948-7142 (e-mail: dan.brewer(a,dot.ca.gov) or me at (209) <br /> 941-1921. <br /> Sincerely, <br /> TOM DUMAS, Chief <br /> Office of Intermodal Planning <br /> "('alirvu improves mobility across Callrornla" <br />