My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011768
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STERLING
>
825
>
2600 - Land Use Program
>
PA-1800005
>
SU0011768
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:25 AM
Creation date
9/9/2019 10:21:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011768
PE
2632
FACILITY_NAME
PA-1800005
STREET_NUMBER
825
Direction
S
STREET_NAME
STERLING
STREET_TYPE
DR
City
MOUNTAIN HOUSE
Zip
95391-
APN
25405006 THROUGH 25405021
ENTERED_DATE
4/25/2018 12:00:00 AM
SITE_LOCATION
825 S STERLING DR
RECEIVED_DATE
4/25/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\STERLING\825\PA-1800005\SU0011768\APPL.PDF \MIGRATIONS\S\STERLING\825\PA-1800005\SU0011768\CDD OK.PDF \MIGRATIONS\S\STERLING\825\PA-1800005\SU0011768\EHD COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iv) A soils report is required pursuant to CBC § 1803 for foundations and CBC appendix § J104 for <br /> grading. All recommendations of the Soils Report shall be incorporated into the construction <br /> drawings. <br /> v) For each proposed new building, provide the following information on the plans: <br /> (1) Description of proposed use <br /> (2) Existing and proposed occupancy Groups <br /> (3) Type of construction <br /> (4) Sprinklers(Yes cr No) <br /> (5) Number of stories <br /> (6) Building height <br /> (7) Allowable floor area <br /> (8) Proposed floor area <br /> (9) Occupant load based on the CBC <br /> (10)Occupant load based on the CPC <br /> vi) Accessible routes shall be provided per CBC § 11 B-206. At least one accessible route shall be <br /> provided within the site from accessible parking spaces and accessible passenger loading zones; <br /> public streets and sidewalks; and public transportation stops to the accessible building or facility <br /> entrance they serve.Where more than one route is provided, all routes must be accessible. §116- <br /> 206.2.1 <br /> vii) At least one accessible route shall connect accessible buildings, accessible facilities, accessible <br /> elements and accessible spaces that are on the same site. §11 B-206.2.2 <br /> viii) At least one accessible route shall connect accessible building or facility entrances with all <br /> accessible spaces and elements within the building or facility, including mezzanines, which are <br /> otherwise connected by a circulation path. §11 B-206.2.4 <br /> ix) Parking spaces will be required to accommodate persons with disabilities in compliance with <br /> Chapter 11 B of the California Building Code. Note that accessible parking spaces are required <br /> for each phase of the project. These parking space(s)shall be located as close as possible to the <br /> primary entrance to the building. <br /> x) Adequate sanitary facilities shall be provided for the facility, per the requirements of Chapter 4 of <br /> the California Plumbing Code. <br /> A) Pursuant to Section 422.4 of the California Plumbing Code, toilet facilities shall be accessible to <br /> employees at all times, should not be more than 500 feet from where employees are regularly <br /> employed and accessible by not more than one flight. <br /> xii) This project will be required to comply with the Model Water Efficient Landscape Ordinance <br /> requirements of the California Code of Regulations, Title 22, Division 2, Chapter 2.7 <br /> o) CALIFORNIA FIRE CODE REQUIREMENTS:The following California Fire Code (CFC) <br /> requirements will be applicable to the proposed project. The following conditions shall be addressed <br /> prior to submittal of a building permit application to the Building Inspection Division. <br /> i) CFC 507 Fire Protection Water Supply—Fire flow and hydrants shall be provided for the <br /> proposed project by the use of: CFC Appendix B—Fire Flow Requirements for Buildings and <br /> Appendix C—Fire Hydrant Locations and Distribution. <br /> ii) Fire Protection Systems shall be installed according to the CFC, Chapter 9 and the appropriate <br /> standards and guides adopted in Chapter 35 of the California Building Code and the California <br /> Electrical Code. <br /> PA-1800005 (SA) Conditions of Approval 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.