My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007488
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
340
>
2600 - Land Use Program
>
PA-0800350
>
SU0007488
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:15 PM
Creation date
9/9/2019 10:24:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007488
PE
2626
FACILITY_NAME
PA-0800350
STREET_NUMBER
340
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
APN
05802005
ENTERED_DATE
11/25/2008 12:00:00 AM
SITE_LOCATION
340 W HWY 12
RECEIVED_DATE
11/24/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 12\340\PA-0800350\SU0007488\APPL.PDF \MIGRATIONS\T\HWY 12\340\PA-0800350\SU0007488\CDD OK.PDF \MIGRATIONS\T\HWY 12\340\PA-0800350\SU0007488\EH COND.PDF \MIGRATIONS\T\HWY 12\340\PA-0800350\SU0007488\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions followed by a Section Number have been identified as ordinance requirements <br /> pertinent to this application. Ordinance requirements cannot be modified, and other <br /> ordinance requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Jason Jones, <br /> 209-468-3136) <br /> a) APPROVED USE: This approval is for an expansion of an existing large winery in three <br /> phases. The existing winery consists of a 1,200 square foot tasting room and a 4,800 <br /> square foot processing building. Phase 1 (building permits to be issued within 18 <br /> months) to consist of a 10,000 square foot warehouse with 2-bay truck dock, Phase 2 <br /> (building permits to be issued within 3 years) to consist of a 5,500 square foot multi- <br /> purpose room for wine tasting and marketing events and the conversion of the existing <br /> wine tasting room to offices; Phase 3 (building permits to be issued within 5 years) to <br /> consist of the expansion of the Phase 1 warehouse by an additional 10,000 square feet <br /> as shown on the site plan dated November 14, 2008. The project includes up to 36 <br /> marketing events annually. (Use Type: Wineries and Wine Cellars-Winery- Large) <br /> b) BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. <br /> The Site Plan required as a part of the building permit must be prepared by a registered <br /> civil engineer or licensed architect. This Plan must show drainage, driveway access <br /> details including gates, on-site parking, landscaping, signs, existing and proposed utility <br /> services, and grading (refer to the "SITE PLAN CHECK LIST' for details). A fee is <br /> required for the Site Plan review. (Development Title Section 9-884) <br /> c) MARKETING EVENTS: Marketing Events are subject to the following regulations: <br /> 1 ) A maximum of thirty-six (36) marketing events are permitted annually as a part of the <br /> proposed marketing plan_ <br /> 2 ) Each event shall have a maximum attendance of 250 people. <br /> 3 } Marketing events shall end by 10:00 p.m. (Development Title Section 9-1075.8[m][21). <br /> d) CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the <br /> Capital Facility Fee is applicable, the County shall collect the fees before the issuance of <br /> any building permits (Development Title Section 9-1245.2) <br /> e) BUSINESS LICENSE: The applicant shall secure an approved Business License prior <br /> to the initiation of the use. (Section 7-1000 of the County Ordinance Code) <br /> f) STORM DRAINAGE: Any additional storm water drainage created by new <br /> improvements shall be retained on-site. The drainage pattern and corresponding storm <br /> drain improvements shall be shown on the Site Plan. Drainage calculations prepared by <br /> a registered civil engineer or architect shall be included. (Development Title Section <br /> 9-1135) <br /> g) PARKING: Off-street parking shall be provided and comply with the following: <br /> 1) All project driveways and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and asphalt concrete or Portland <br />
The URL can be used to link to this page
Your browser does not support the video tag.