Laserfiche WebLink
UP-99-2 <br /> Page 2 <br /> C. Connection to an approved public water supply system as required by Section 9-1.120.2 <br /> of the San Joaquin County Development Title. <br /> (a) Test well will be required to meet the following: <br /> 1. Water quality tested to meet Title 22, CCR (Safe Drinking Water Act), <br /> requirements. <br /> 2. Water quantity tested to show an adequate source. <br /> 3. Results approved by the Environmental Health Division and County <br /> Public Works prior to final approval of improvement plans. <br /> NOTE: Contact the Environmental Health Division for Public Well construction requirements. <br />