Laserfiche WebLink
California Regional Water Quality Control Board <br /> Central Valley Region <br /> Robert Schneider,Chair <br /> Alan C.Lloyd Ph.D. Arnold Schwarzenegger <br /> Agency Secretary Sacramento Main Office Governor <br /> Internet Address: http://www.swrcb.ca.gov/—rwgcb5 <br /> 11020 Sun Center Drive,#200,Rancho Cordova,CA 95670-6114 <br /> Phone(916)464-3291 •FAX(916)4644780 <br /> APR 2005 <br /> 7 April 2005 <br /> ENVIRONMENT HEALTH <br /> PERMIT/SEWCES <br /> John Funderburg Frank Alegre <br /> San Joaquin County Comm. Develop. Dept. Alegre Trucking <br /> 1810 E. Hazelton Ave. 2000 Edgewood Drive <br /> Stockton, CA 95205 Lodi, CA 95242 <br /> GENERAL PLANAMENDMENT/ZONING CHANGE,ALEGRE TRUCKING, LODI, SAN <br /> JOAQUIN COUNTY, STATE CLEARINGHOUSE NO. 2005032033 <br /> I have reviewed the General Plan Amendment and Negative Declaration for the proposed zoning change <br /> from general agriculture to industrial/transportation to allow a truck terminal to be constructed west of <br /> Lodi. The State Clearinghouse No. is 2005032033. The document briefly describes plans to construct a <br /> truck terminal on 44.63 acres at 5184 W. State Route 12 Highway, Lodi. <br /> Waste Discharge Requirements <br /> If wastewater will be generated and treated, stored, or disposed on site at the processing facility, Waste <br /> Discharge Requirements (WDRs) may be required. In accordance with California Water Code Section <br /> 13260, the project proponent shall submit a Report of Waste Discharge (RWD) at least 150 days prior to <br /> discharging wastewater at the site. <br /> Construction Stormwater Permit <br /> A National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water <br /> Discharges Associated with Construction Activities, Order No. 99-28-DWQ is required when a project <br /> involves clearing, grading, or disturbances to the ground, such as stockpiling, or excavation. Currently, <br /> construction activity that involves soil disturbances on construction sites one acre or greater or which are <br /> part of a larger common plan of development or sale require a construction storm water permit. <br /> Because construction associated with the project will disturb more than one acre, the property owner <br /> needs to obtain permit coverage under the NPDES General Permit No. CAS000002 for Discharges of <br /> Storm Water Associated With Construction Activity. Before construction begins, the proponent must <br /> submit an NOI to comply with the permit to the State Water Resources Control Board and a Stormwater <br /> Pollution Prevention Plan (SWPPP) must be prepared. <br /> Industrial Stormwater Permit <br /> Depending on the Standard Industrial Classification (SIC) code of the final project, compliance with the <br /> NPDES General Permit No. CAS000001 for Discharges of Storm Water Associated With Industrial <br /> Activities may be required. The SIC codes of activities requiring coverage are listed in the General <br /> California Environmental Protection Agency <br /> 01 Recycled Paper <br />