Laserfiche WebLink
-Mar , 2, 2005 10 : 02AM CA DEPARTMENT OF TRANSPORTATION No , 3351 P . 2/4 <br /> 51'ATI?UF('AI.1FORNIA—gU41NIfiC 1 UNS1,QR1 ,NJANllHOUSING AGENCY — ` -� ARNOLDSCHWAR7EIyEC:CFR(mvemor <br /> DEPARTMENT OF TRANSPORTATION <br /> P.O.BOX 2048 STOCKTON,CA 952()1 <br /> (1976 E. CHAR'I'ER WAY/1970 F., DR_ MARTIN <br /> LUMER DING JR.BLVD 95205) <br /> TTY:California May Scrvice(800)735-2929 Flrayourpower! <br /> PHONE (209)941-1921 ee energy efJiciewl <br /> FAX (209)948-7194 <br /> February 28, 2005 <br /> 10-SJ-12 <br /> Post Mile 11.0 <br /> PA 400620 <br /> Alegre Construction Yard <br /> John Funderburg <br /> Safi Joaquin County <br /> Connmunity Redevelopment Department <br /> Development Services Division <br /> 18 10 East Ha7clton Avenue <br /> Stockton, CA 95205 <br /> Dear Mr. Funderburg: <br /> The California Department of Transportation (Department) appreciates the opportunity to <br /> have reviewed the General Plan Amendment to change the designation the land use of <br /> 66.43 acres from general agriculture (A/G) to truck terininaI (I/T) adjacent to State Route <br /> 12 (SR-12) and near the SR-12/Flag City Boulevard intersection„ The Department has the <br /> following comments: <br /> e The Department has no objection with the proposed General Plan A.zxmenchment <br /> application. The proposed change in zoning from A/G to I/T does, however, have the <br /> potential to significantly impact SR 12. Tt is difficult to analyze the project's effects <br /> on traffic without knowing the actual project size and use (square footage, tunes of <br /> use, operations, et cetera) of the proposed construction yard. Once this information is <br /> provided, we will be able to complete our review and detem-li-ne if a Traffic Impact <br /> Study (TIS) and mitigation is required. <br /> • An encroachment penixit niust be obtained for all proposed activities for placement of <br /> encroaclu-.cnts within, under or over the State highway rights- of-way. Activity and <br /> work planned in the State right-of-way shall be performed to State standards and <br /> specifications, at no cost to the State. Engineering plans, calculations, specifications, <br /> and reports (documents) shall be stamped and signed off by a licensed Engineer or <br /> Architect,. Engineering documents for activity and work in the State right-of-way <br /> "Caltrans improves mobiliry across C'aliJornta" <br />