Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-0700125 <br /> Alegre <br /> Use Permit Application No. PA-0700125 was approved by the San Joaquin County Planning <br /> Commission on October 2, 2008. The effective date of approval is October 12, 2008. This approval <br /> will expire on April 13, 2010, which is 18 months from the effective date of approval, unless (1) all <br /> Conditions of Approval have been complied with, (2) all necessary building permits have been <br /> secured and remain in force, and (3) all necessary permits from other agencies have been secured <br /> and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br />' application. Ordinance.requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff.Contact: Kevin Swanson, 468-9653) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT". The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVEDVSE: To establish a truck parking and heavy equipment storage site. The project <br /> includes a 200 square foot commercial coach to be utilized as an office. The applicant proposes to <br /> park a maximum of 80 trucks on site at any given time.The equipment storage will consist of some <br /> farm equipment and heavy and light construction equipment.The project site is restricted to the <br /> northern ten (10)acres of a 23.5 acre parcel (consisting of APN'S 055-160-73, 24,43&44)only. <br /> The project will operate 24 hours a day, seven days a week as shown on the site plan dated August <br /> 1, 2008 (Use type: Truck Sales and Service Parking) <br /> c. CAPITAL FACILITY FEE:This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is,applicable, the County shall collect the fees before the issuance of any building <br /> t permits. (Development Title Section 9-1245.2) <br /> d. BUSINESS LICENSE: The applicant shall secure an approved Business License prior to the <br /> initiation of the use. (Section 7-1000 of the County Ordinance Code) <br /> e. STORM DRAINAGE: Stormwater drainage shall be retained on-site.The drainage pattern and <br /> corresponding storm drain improvements shall be shown on the Site Plan. Drainage calculations <br /> prepared by a registered civil engineer or architect shall be included. (Development Title Section 9- <br /> 1135) <br /> f. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All storage areas, including areas for trailers and heavy equipment, shall be surfaced with a <br /> minimum':of four-inch aggregate base. Trailers or heavy equipment parked on pavement do not <br /> require screening. <br /> Conditions of Approval - 1 - PA=0700125 <br />