Laserfiche WebLink
,i"` 0 <br /> Chandler Martin 2 <br /> COMMUNITY DEVELOPMENT DEPARTMENT <br /> PA-07-125 (UP) <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit from Caltrans shall be required for work within the State right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway and access road shall be designed to(STAA)truck standard. <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee currently is $200.57 per daily trip-end generated in the Lodi <br /> area. The total fee due is$82,133.42. (Resolutions R-00-433) <br /> 4. The Regional Traffic Impact Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application.The fee has been determined to be $65,438.27, which reflects the <br /> facilities traffic volume applied to the impact fee rate for facilities designated as Industrial. (Resolution R- <br /> 06-38) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Applicant shall obtain a Storm Water Pollution Prevention Plan(SWPPP)permit from the State Water <br /> Resources Control Board prior to the beginning of any construction. <br /> I' <br /> i <br /> 7. Dischargers whose projects disturb 1 or more acres of soil or whose projects disturb less than Iacre but are <br /> part of a larger common plan of development that in total disturbs I or more acres, are required to obtain <br /> coverage under the General Permit for Discharges of,Storm Water Associated with Construction Activity <br /> (Construction General Permit, 99-08-DWQ). <br /> Note: No county Services are available to this site. <br /> MRC:DG:av <br /> P-ICOMMENTSWAYR 20071PA-0790125 APPLICAT1ON.doc <br />{ <br />